Implementation Aspects of Substation Automation Systems based on IEC 61850

被引:0
作者
Adhikary, Biswajit [1 ]
Rao, Sudhakar [1 ]
Balasani, Srinivasa Rao [2 ]
机构
[1] Minist Def Registered Elect Contractor Firm, Murli Krishna Associates, Power Syst Dept, Visakhapatnam, Andhra Pradesh, India
[2] Andhra Univ, SVP Engn Coll, Elect & Elect Engn Dept, Visakhapatnam, Andhra Pradesh, India
来源
2016 2ND INTERNATIONAL CONFERENCE ON CONTROL, INSTRUMENTATION, ENERGY & COMMUNICATION (CIEC) | 2016年
关键词
IEC61850; substation; automation; standard;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The Power industry was in demand of a universal global communication standard to enable interoperability and integration between different manufacturers and types of IED, for substation Automation. International Electro-technical Commission (IEC) has developed a global communication standard IEC 61850 to facilitate substation automation. This paper discusses the protocol structure of IEC61850 and researches on the GOOSE messages for interlocking, Ethernet topologies with IEC62850 and SCL. It also elaborates the challenges of migration to IEC61850. Migration to IEC61850 for old substations is a complex and time consuming process, effort has been given to outline a step by step process to introduce IEC61850 into a substation.
引用
收藏
页码:442 / 445
页数:4
相关论文
共 50 条
  • [41] Reliability and Availability of Multi-Channel IEC-61850 Substation Communication Networks for Mission-Critical Applications
    Mathebula, Vonani Clive
    Saha, Akshay Kumar
    INTERNATIONAL JOURNAL OF ENGINEERING RESEARCH IN AFRICA, 2020, 51 : 199 - 216
  • [42] Investigation of an IEC 61850 standard-based process bus implementation of a protection and control scheme for parallelly connected transformers
    Pieters, Willem D.
    Tzoneva, Raynitchka
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2021, 19 (04) : 850 - 875
  • [43] IEC61850 standard-based motor protection scheme
    Wellen, Joniff
    Krishnamurthy, Senthil
    2020 IEEE PES & IAS POWERAFRICA CONFERENCE, 2020,
  • [44] Challenges to the Implementation of a Real-Time Process Bus According to IEC 61850-9
    Igarashi, G.
    Santos, J. C.
    2014 IEEE PES INNOVATIVE SMART GRID TECHNOLOGIES CONFERENCE EUROPE (ISGT EUROPE), 2014,
  • [45] Substation Automation System Design Based on WINCC and PLC
    WangHong
    AEIT 2012: 2012 2ND INTERNATIONAL CONFERENCE ON AEROSPACE ENGINEERING AND INFORMATION TECHNOLOGY, VOL 2, 2012, : 374 - 379
  • [46] Retrofit to IEC 61850 of a Line-Bay in Transmission Substation. Case Study: INGA1/SE Pomasqui
    Mosquera, Ana
    Proano, Rommel
    Vallejo, Carlos
    Gamboa, Silvana
    Rodas, Ana
    APPLIED TECHNOLOGIES (ICAT 2019), PT III, 2020, 1195 : 153 - 165
  • [47] Complex Industrial Systems Automation Based on the Internet of Things Implementation
    Kondratenko, Yuriy
    Kozlov, Oleksiy
    Korobko, Oleksiy
    Topalov, Andriy
    INFORMATION AND COMMUNICATION TECHNOLOGIES IN EDUCATION, RESEARCH, AND INDUSTRIAL APPLICATIONS, ICTERI 2017, 2018, 826 : 164 - 187
  • [48] Principles of Power Management in a Smart Microgrid Based on Std. IEC 61850
    Palizban, Omid
    Kauhaniemi, Kimmo
    2017 IEEE PES INNOVATIVE SMART GRID TECHNOLOGIES CONFERENCE EUROPE (ISGT-EUROPE), 2017,
  • [49] Implementation aspects of the PLC standard IEC 1131-3
    Ohman, M
    Johansson, S
    Arzen, KE
    COMPUTER AIDED CONTROL SYSTEMS DESIGN (CACSD'97), 1997, : 27 - 32
  • [50] ML-based Anomaly Detection System for IEC 61850 Communication in Substations
    Bhattacharya, Somadeep
    Sagib, Nazmus
    Govindarasu, Manimaran
    2024 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, PESGM 2024, 2024,