Implementation Aspects of Substation Automation Systems based on IEC 61850

被引:0
|
作者
Adhikary, Biswajit [1 ]
Rao, Sudhakar [1 ]
Balasani, Srinivasa Rao [2 ]
机构
[1] Minist Def Registered Elect Contractor Firm, Murli Krishna Associates, Power Syst Dept, Visakhapatnam, Andhra Pradesh, India
[2] Andhra Univ, SVP Engn Coll, Elect & Elect Engn Dept, Visakhapatnam, Andhra Pradesh, India
来源
2016 2ND INTERNATIONAL CONFERENCE ON CONTROL, INSTRUMENTATION, ENERGY & COMMUNICATION (CIEC) | 2016年
关键词
IEC61850; substation; automation; standard;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The Power industry was in demand of a universal global communication standard to enable interoperability and integration between different manufacturers and types of IED, for substation Automation. International Electro-technical Commission (IEC) has developed a global communication standard IEC 61850 to facilitate substation automation. This paper discusses the protocol structure of IEC61850 and researches on the GOOSE messages for interlocking, Ethernet topologies with IEC62850 and SCL. It also elaborates the challenges of migration to IEC61850. Migration to IEC61850 for old substations is a complex and time consuming process, effort has been given to outline a step by step process to introduce IEC61850 into a substation.
引用
收藏
页码:442 / 445
页数:4
相关论文
共 50 条
  • [1] Testing Protection Relays Based on IEC 61850 in Substation Automation Systems
    Daboul, Mayada
    Orsagova, Jaroslava
    Bajanek, Tomas
    Wasserbauer, Vojtech
    PROCEEDINGS OF THE 2015 16TH INTERNATIONAL SCIENTIFIC CONFERENCE ON ELECTRIC POWER ENGINEERING (EPE), 2015, : 335 - 340
  • [2] IEC61850 Implementation in Localization of Power Substation Automation System
    Tavakoli, Saeid G.
    Mohammadi, Davood S.
    Gohari, Behrooz M.
    Mir, Mandi
    Mehrabian, Armin
    Razeghi, Behrooz
    Sebtahmadi, S. Sina
    2014 IEEE INTERNATIONAL SYMPOSIUM ON ROBOTICS AND MANUFACTURING AUTOMATION (ROMA), 2014, : 92 - 98
  • [3] Implementation of UCA/IEC 61850 for substation automation at grant county public utility district
    White, Joseph
    2005/2006 IEEE/PES TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION, VOLS 1-3, 2006, : 384 - 389
  • [4] First substation with IEC61850 commissioned in the Americas
    Rodrigues, Jose
    Soldani, Leonardo
    Wong, Gordon
    2006 IEEE/PES TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION: LATIN AMERICA, VOLS 1-3, 2006, : 1430 - +
  • [5] Design of a Backup IED for IEC 61850-Based Substation
    Lim, Il-Hyung
    Sidhu, Tarlochan S.
    IEEE TRANSACTIONS ON POWER DELIVERY, 2013, 28 (04) : 2048 - 2055
  • [6] IEC61850-Based Analysis of Coal Mine Ground Transformer Substation Integrated Automation Communication System
    Gao Yongxin
    HYDRAULIC EQUIPMENT AND SUPPORT SYSTEMS FOR MINING, 2013, 619 : 199 - 202
  • [7] Feasibility analysis of IEC 61850 used as substation telecontrol protocol
    Wang, W. (wangwl@nari-relays.com), 1600, Automation of Electric Power Systems Press (36): : 109 - 112
  • [8] The Study Based on IEC61850 Substation Information System Modeling
    Xian, Yu
    PROCEEDINGS OF THE 2012 INTERNATIONAL CONFERENCE OF MODERN COMPUTER SCIENCE AND APPLICATIONS, 2013, 191 : 565 - 570
  • [9] IEC 61850: FUNCTIONALITY AND IMPLEMENTATION
    Jirickova, Jana
    PROCEEDINGS OF THE 8TH INTERNATIONAL SCIENTIFIC CONFERENCE ELECTRIC POWER ENGINEERING 2007, 2007, : 74 - 77
  • [10] The IEC 61850 Standard - Communication Networks and Automation Systems from an Electrical Engineering Point of View
    Rangelov, Yulian
    Nikolaev, Nikolay
    Ivanova, Milena
    2016 19TH INTERNATIONAL SYMPOSIUM ON ELECTRICAL APPARATUS AND TECHNOLOGIES (SIELA), 2016,