A novel mathematical model for manpower scheduling in break (relief) times in mixed model assembly lines

被引:0
|
作者
Hasani-Goodarzi, Asefeh [1 ]
Rabbani, Masoud [1 ]
Manavizade, Neda [1 ]
机构
[1] Univ Tehran, Fac Engn, Dept Ind Engn, Tehran, Iran
来源
WORLD CONFERENCE ON BUSINESS, ECONOMICS AND MANAGEMENT (BEM-2012) | 2012年 / 62卷
关键词
Mixed-model assembly line; manpower scheduling; break time; mathematical model; ALGORITHM; WORKFORCE; STAFF;
D O I
10.1016/j.sbspro.2012.09.234
中图分类号
F [经济];
学科分类号
02 ;
摘要
In real industries there are some limitations on the number of workers and in some situations it is unavoidable to schedule employees for break times to minimize labor cost. In this paper, the problem of manpower scheduling in break times for employees working in mixed model assembly lines (MMALs) is investigated, which has not been studied to the best of our knowledge. We assume three breaks a day, one for lunching and two breaks for short resting. It is also essential to attend the station by the minimum number of workers while manufacturing desired rate of production. (C) 2012 Published by Elsevier Ltd. Selection and/or peer review under responsibility of Prof. Dr. Huseyin Arasli
引用
收藏
页码:1371 / 1377
页数:7
相关论文
共 50 条
  • [41] Mathematical model and adaptive simulated annealing algorithm for mixed-model assembly job-shop scheduling with lot streaming
    Cheng, Lixin
    Tang, Qiuhua
    Zhang, Liping
    JOURNAL OF MANUFACTURING SYSTEMS, 2023, 70 : 484 - 500
  • [42] Simultaneous solving of balancing and sequencing problems with station-dependent assembly times for mixed-model assembly lines
    Mosadegh, H.
    Zandieh, M.
    Ghomi, S. M. T. Fatemi
    APPLIED SOFT COMPUTING, 2012, 12 (04) : 1359 - 1370
  • [43] Mathematical model and augmented simulated annealing algorithm for mixed-model assembly job shop scheduling problem with batch transfer
    Cheng, Lixin
    Tang, Qiuhua
    Liu, Shengli
    Zhang, Liping
    KNOWLEDGE-BASED SYSTEMS, 2023, 279
  • [44] Dynamic resequencing at mixed-model assembly lines
    Franz, Christian
    Koberstein, Achim
    Suhl, Leena
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (11) : 3433 - 3447
  • [45] Balancing and Sequencing Optimization of the Mixed Model Assembly Lines
    Cao, Zhenxin
    Ma, Shiping
    ISCSCT 2008: INTERNATIONAL SYMPOSIUM ON COMPUTER SCIENCE AND COMPUTATIONAL TECHNOLOGY, VOL 1, PROCEEDINGS, 2008, : 732 - 736
  • [46] SEQUENCING JIT MIXED-MODEL ASSEMBLY LINES
    INMAN, RR
    BULFIN, RL
    MANAGEMENT SCIENCE, 1991, 37 (07) : 901 - 904
  • [47] Efficient material flow in mixed model assembly lines
    Alnahhal, Mohammed
    Noche, Bernd
    SPRINGERPLUS, 2013, 2 : 1 - 12
  • [48] AN ANALYTIC FRAMEWORK FOR SEQUENCING MIXED MODEL ASSEMBLY LINES
    BARD, JF
    DAREL, E
    SHTUB, A
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (01) : 35 - 48
  • [49] A sequencing algorithm for mixed-model assembly lines
    Tokyo Metropolitan University
    J. Jpn Ind. Manage. Assoc., 2007, 4 (257-266):
  • [50] Sequencing mixed-model assembly lines by considering feeding lines
    Parviz Fattahi
    Neda Beitollahi Tavakoli
    Mehdi Fathollah
    Abdolreza Roshani
    Mohsen Salehi
    The International Journal of Advanced Manufacturing Technology, 2012, 61 : 677 - 690