A novel mathematical model for manpower scheduling in break (relief) times in mixed model assembly lines

被引:0
|
作者
Hasani-Goodarzi, Asefeh [1 ]
Rabbani, Masoud [1 ]
Manavizade, Neda [1 ]
机构
[1] Univ Tehran, Fac Engn, Dept Ind Engn, Tehran, Iran
来源
WORLD CONFERENCE ON BUSINESS, ECONOMICS AND MANAGEMENT (BEM-2012) | 2012年 / 62卷
关键词
Mixed-model assembly line; manpower scheduling; break time; mathematical model; ALGORITHM; WORKFORCE; STAFF;
D O I
10.1016/j.sbspro.2012.09.234
中图分类号
F [经济];
学科分类号
02 ;
摘要
In real industries there are some limitations on the number of workers and in some situations it is unavoidable to schedule employees for break times to minimize labor cost. In this paper, the problem of manpower scheduling in break times for employees working in mixed model assembly lines (MMALs) is investigated, which has not been studied to the best of our knowledge. We assume three breaks a day, one for lunching and two breaks for short resting. It is also essential to attend the station by the minimum number of workers while manufacturing desired rate of production. (C) 2012 Published by Elsevier Ltd. Selection and/or peer review under responsibility of Prof. Dr. Huseyin Arasli
引用
收藏
页码:1371 / 1377
页数:7
相关论文
共 50 条
  • [11] Scheduling mixed-model final assembly lines in JIT manufacturing
    Mohammadi, G.
    Ozbayrak, M.
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2006, 19 (04) : 377 - 382
  • [12] Ant Colony Optimization algorithms for scheduling the mixed model assembly lines
    Sun, XY
    Sun, LY
    ADVANCES IN NATURAL COMPUTATION, PT 3, PROCEEDINGS, 2005, 3612 : 911 - 914
  • [13] Cyclic scheduling of flexible mixed model assembly lines with parallel stations
    Öztürk, Cemalettin
    Tunali, Semra
    Hnich, Brahim
    Örnek, Arslan
    Journal of Manufacturing Systems, 2015, 36 : 147 - 158
  • [14] Cyclic scheduling of flexible mixed model assembly lines with parallel stations
    Ozturk, Cemalettin
    Tunali, Semra
    Hnich, Brahim
    Ornek, Arslan
    JOURNAL OF MANUFACTURING SYSTEMS, 2015, 36 : 147 - 158
  • [16] An evolutionary approach to multi-objective scheduling of mixed model assembly lines
    Celano, G
    Fichera, S
    Grasso, V
    La Commare, U
    Perrone, G
    COMPUTERS & INDUSTRIAL ENGINEERING, 1999, 37 (1-2) : 69 - 73
  • [17] BUILD SEQUENCE SCHEDULING TO MINIMIZE COMPLEXITY IN MIXED-MODEL ASSEMBLY LINES
    Zhu, Xiaowei
    Wang, Hui
    Hu, S. Jack
    Koren, Yoram
    PROCEEDINGS OF THE 9TH BIENNIAL CONFERENCE ON ENGINEERING SYSTEMS DESIGN AND ANALYSIS - 2008, VOL 4, 2009, : 491 - 499
  • [18] Co-scheduling of mobile robots in mixed-model assembly lines
    Zhou B.-H.
    Xu J.-H.
    Kongzhi yu Juece/Control and Decision, 2018, 33 (11): : 1959 - 1966
  • [19] Produktionsprogrammplanung bei VariantenfließfertigungMaster scheduling in mixed-model assembly lines
    Nils Boysen
    Zeitschrift für Planung & Unternehmenssteuerung, 2005, 16 (1): : 53 - 72
  • [20] Scheduling Mixed-Model Assembly Lines with Cost Objectives by a Hybrid Algorithm
    Wang, Binggang
    Rao, Yunqing
    Shao, Xinyu
    Wang, Mengchang
    INTELLIGENT ROBOTICS AND APPLICATIONS, PT II, PROCEEDINGS, 2008, 5315 : 378 - 387