A novel mathematical model for manpower scheduling in break (relief) times in mixed model assembly lines

被引:0
|
作者
Hasani-Goodarzi, Asefeh [1 ]
Rabbani, Masoud [1 ]
Manavizade, Neda [1 ]
机构
[1] Univ Tehran, Fac Engn, Dept Ind Engn, Tehran, Iran
来源
WORLD CONFERENCE ON BUSINESS, ECONOMICS AND MANAGEMENT (BEM-2012) | 2012年 / 62卷
关键词
Mixed-model assembly line; manpower scheduling; break time; mathematical model; ALGORITHM; WORKFORCE; STAFF;
D O I
10.1016/j.sbspro.2012.09.234
中图分类号
F [经济];
学科分类号
02 ;
摘要
In real industries there are some limitations on the number of workers and in some situations it is unavoidable to schedule employees for break times to minimize labor cost. In this paper, the problem of manpower scheduling in break times for employees working in mixed model assembly lines (MMALs) is investigated, which has not been studied to the best of our knowledge. We assume three breaks a day, one for lunching and two breaks for short resting. It is also essential to attend the station by the minimum number of workers while manufacturing desired rate of production. (C) 2012 Published by Elsevier Ltd. Selection and/or peer review under responsibility of Prof. Dr. Huseyin Arasli
引用
收藏
页码:1371 / 1377
页数:7
相关论文
共 50 条
  • [1] Mathematical Model for Proactive Resequencing of Mixed Model Assembly Lines
    Kampker, Achim
    Kreiskoether, Kai
    Schumacher, Marius
    SUSTAINABLE MANUFACTURING FOR GLOBAL CIRCULAR ECONOMY, 2019, 33 : 438 - 445
  • [2] Balancing and scheduling of flexible mixed model assembly lines
    Cemalettin Öztürk
    Semra Tunalı
    Brahim Hnich
    M. Arslan Örnek
    Constraints, 2013, 18 : 434 - 469
  • [3] Balancing and scheduling of flexible mixed model assembly lines
    Ozturk, Cemalettin
    Tunali, Semra
    Hnich, Brahim
    Ornek, M. Arslan
    CONSTRAINTS, 2013, 18 (03) : 434 - 469
  • [4] An optimization model for material supply scheduling at mixed-model assembly lines
    Fathi, Masood
    Syberfeldt, Anna
    Ghobakhloo, Morteza
    Eskandari, Hamidreza
    51ST CIRP CONFERENCE ON MANUFACTURING SYSTEMS, 2018, 72 : 1258 - 1263
  • [5] Scheduling Utility Workers at Mixed-Model Assembly Lines
    Gujjula, Rico
    Guenther, Hans-Otto
    2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2009, : 1092 - 1096
  • [6] MIXED MODEL ASSEMBLY SCHEDULING BY CONSIDERING ASSEMBLY TIMES AND PARTS PRICES IN A SINGLE WORKSTATION
    Zhang, Jiajun
    Miyazaki, Shigeji
    Yanagawa, Yoshinari
    ICIM 2010: PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2010, : 116 - +
  • [7] Scheduling optimization of mixed model assembly lines Based on Genetic Algorithms
    Cheng, Shuo
    Yuan, Minghai
    Yan, Shuyang
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS RESEARCH AND MECHATRONICS ENGINEERING, 2015, 121 : 186 - 190
  • [8] Balancing and scheduling of flexible mixed model assembly lines with parallel stations
    Cemalettin Öztürk
    Semra Tunalı
    Brahim Hnich
    Arslan Örnek
    The International Journal of Advanced Manufacturing Technology, 2013, 67 : 2577 - 2591
  • [9] Cyclic scheduling of flexible mixed model assembly lines with parallel stations
    Insight Centre for Data Analytics, University College Cork, Cork, Ireland
    不详
    不详
    不详
    J Manuf Syst, (147-158):
  • [10] Balancing and scheduling of flexible mixed model assembly lines with parallel stations
    Ozturk, Cemalettin
    Tunali, Semra
    Hnich, Brahim
    Ornek, Arslan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 67 (9-12): : 2577 - 2591