SPACE ZONING CONCEPT-BASED SCHEDULING MODEL FOR REPETITIVE CONSTRUCTION PROCESS

被引:12
|
作者
Cho, Kyuman [1 ]
Hong, Taehoon [2 ]
Hyun, Chang Taek [3 ]
机构
[1] Chosun Univ, Dept Architectural Engn, Kwangju, South Korea
[2] Yonsei Univ, Dept Architectural Engn, Seoul 120749, South Korea
[3] Univ Seoul, Dept Architectural Engn, Seoul, South Korea
基金
新加坡国家研究基金会;
关键词
space zoning; scheduling; computer aided simulation; process model; PRODUCT DEVELOPMENT; WORK SPACE; SIMULATION; DISTRIBUTIONS; BUILDINGS; PROJECTS; NETWORK; TIME; COST;
D O I
10.3846/13923730.2012.757561
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Many researchers have studied effective space zoning to reduce the duration of a construction project and interference among work tasks. These studies, however, attempted to plan the construction schedule using the space zoning concept based on network-based scheduling methods. Accordingly, it was difficult to reflect the representative characteristics of space zoning, such as iteration and overlapping. To overcome such limitations of existing methodologies and to achieve schedule reduction of a construction project by maximizing productivity, a Space zoning Concept-based scHEduling ModEl (SCHEME) for repetitive construction processes that adopt simulation techniques was developed in this study. The result of the application of the developed model to actual construction cases shows that the model reflects well the space-zoning characteristics, and in terms of the reduction of the construction duration, the model yielded a superior outcome in nonspace-zoning cases. The model developed in this study is expected to produce an excellent effect on the repetitive construction processes, in terms of construction duration.
引用
收藏
页码:409 / 421
页数:13
相关论文
共 20 条
  • [1] Integrated Schedule and Cost Model for Repetitive Construction Process
    Cho, Kyuman
    Hong, Taehoon
    Hyun, Changtaek
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2010, 26 (02) : 78 - 88
  • [2] Scheduling model for repetitive construction processes for high-rise buildings
    Cho, Kyuman
    Hong, Taehoon
    Hyun, Changtaek
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2011, 38 (01) : 36 - 48
  • [3] Time-delay concept-based approach to maintenance scheduling of HV cables
    Yuan, Jing
    Zhou, Wenjun
    Xu, Xiaobing
    Liao, Yanqun
    Zhou, Chengke
    HIGH VOLTAGE, 2020, 5 (06): : 724 - 730
  • [4] Non-unit-based planning and scheduling of repetitive construction projects
    Huang, Rong-Yau
    Sun, Kuo-Shun
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (06) : 585 - 597
  • [5] Construction of a Civil Engineering Construction Machinery Scheduling Model Based on Queuing Theory
    Ying, Ma
    Hui, Zhang
    AGRO FOOD INDUSTRY HI-TECH, 2017, 28 (01): : 725 - 729
  • [6] Model construction of planning and scheduling system based on digital twin
    Wang, Yunrui
    Wu, Zhengli
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2020, 109 (7-8) : 2189 - 2203
  • [7] Auditing Construction Cost from an In-Process Perspective Based on a Bayesian Predictive Model
    Wang, Peipei
    Wang, Kun
    Huang, Yunhan
    Fenn, Peter
    Stewart, Ian
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (04)
  • [8] An activity-based lessons learned model to support scheduling decisions in construction
    Yilmaz, Anil
    Akcay, Emre Caner
    Dikmen, Irem
    Birgonul, M. Talat
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2025,
  • [9] A model based control concept with knowledge based overhead control of a roasting process
    Voglauer, B
    Geyrhofer, W
    Jörgl, HP
    PROCEEDINGS OF THE 2004 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 2004, : 3581 - 3586
  • [10] Construction of building fire information monitoring model based on adaptive clustering scheduling
    Li, Ying
    Xue, Lian
    INTERNATIONAL JOURNAL OF INTERNET PROTOCOL TECHNOLOGY, 2019, 12 (03) : 121 - 127