Risk-Constrained Multi-Stage Wind Power Investment

被引:96
作者
Baringo, Luis [1 ]
Conejo, Antonio J. [1 ]
机构
[1] Univ Castilla La Mancha, E-13071 Ciudad Real, Spain
关键词
Mathematical program with equilibrium constraints (MPEC); risk management; stochastic programming; wind power investment; GENERATION;
D O I
10.1109/TPWRS.2012.2205411
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
When deciding on wind power investments, three major issues arise: the production variability and uncertainty of wind facilities, the eventual future decline in wind power investment costs, and the significant financial risk involved in such investment decisions. Recognizing the above important issues, this paper proposes a risk-constrained multi-stage stochastic programming model to make optimal investment decisions on wind power facilities along a multi-stage horizon. The proposed model is illustrated using a clarifying example and a case study.
引用
收藏
页码:401 / 411
页数:11
相关论文
共 50 条
[41]   Risk-constrained optimal strategy for retailer forward contract portfolio [J].
Ahmadi, Abdollah ;
Charwand, Mansour ;
Aghaei, Jamshid .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2013, 53 :704-713
[42]   Risk-Constrained Profit Maximization for Microgrid Aggregators with Demand Response [J].
Duong Tung Nguyen ;
Le, Long Bao .
IEEE TRANSACTIONS ON SMART GRID, 2015, 6 (01) :135-146
[43]   Security-Constrained Multi-Stage Robust Dynamic Economic Dispatch with Bulk Storage [J].
Dai, Li ;
Ye, Renshi ;
You, Dahai ;
Yin, Xianggen .
ENERGIES, 2025, 18 (05)
[44]   Multi-stage risk-based assessment for wind energy accommodation capability: A robust and non-anticipative method [J].
Xiong, Houbo ;
Zhou, Yue ;
Guo, Chuangxin ;
Ding, Yi ;
Luo, Fengji .
APPLIED ENERGY, 2023, 350
[45]   Multi-objective risk-constrained optimal performance of hydrogen-based multi energy systems for future sustainable societies [J].
Li, Ji ;
Chen, Jun ;
Yuan, Zhi ;
Xu, Lei ;
Zhang, Yuying ;
Al-Bahrani, Mohammed .
SUSTAINABLE CITIES AND SOCIETY, 2022, 87
[46]   Wind power investment within a market environment [J].
Baringo, L. ;
Conejo, A. J. .
APPLIED ENERGY, 2011, 88 (09) :3239-3247
[47]   Risk-Constrained Operation for Internet Data Centers in Deregulated Electricity Markets [J].
Yu, Liang ;
Jiang, Tao ;
Cao, Yang ;
Zhang, Qian .
IEEE TRANSACTIONS ON PARALLEL AND DISTRIBUTED SYSTEMS, 2014, 25 (05) :1306-1316
[48]   Dynamic sampling algorithms for multi-stage stochastic programs with risk aversion [J].
Philpott, A. B. ;
de Matos, V. L. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 218 (02) :470-483
[49]   Risk-Constrained Scheduling and Offering Strategies of a Price-Maker Hydro Producer Under Uncertainty [J].
Pousinho, Hugo M. I. ;
Contreras, Javier ;
Bakirtzis, Anastasios G. ;
Catalao, Joao P. S. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (02) :1879-1887
[50]   RETRACTED: Risk-constrained stochastic power procurement of storage-based large electricity consumer (Retracted Article) [J].
Cao, Yan ;
Wang, Qiangfeng ;
Fan, Qingming ;
Nojavan, Sayyad ;
Jermsittiparsert, Kittisak .
JOURNAL OF ENERGY STORAGE, 2020, 28