摘要
There is a growing interest in the research of deteriorating job-scheduling problems in recent years. However, the group technology is relatively unexplored in this field. In addition, the group setup times are assumed to be known and fixed. In reality, process setup or preparation often requires more time as food quality deteriorates or a patient's condition worsens. Therefore, this paper considers a situation where both setup times and job-processing times are lengthened as jobs wait to be processed. Specifically, two single-machine group-scheduling problems are investigated where the group setup times and the job-processing times are both increasing functions of their starting times. We first prove that the makespan minimization problem remains polynomially solvable when the deterioration is present. We then show that the sum of completion times problem is polynomially solvable when the numbers of jobs in each group are equal. For the case of unequal job sizes, a heuristic algorithm is proposed, and the computational experiments show that the performance of the heuristic is fairly accurately when the deterioration rate is small. (c) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:128 / 133
页数:6
相关论文
共 27 条
[1]   Scheduling with time dependent processing times: Review and extensions [J].
Alidaee, B ;
Womer, NK .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1999, 50 (07) :711-720
[2]   SCHEDULING DETERIORATING JOBS ON A SINGLE PROCESSOR [J].
BROWNE, S ;
YECHIALI, U .
OPERATIONS RESEARCH, 1990, 38 (03) :495-498
[3]  
Burbidge J., 1979, GROUP TECHNOLOGY ENG
[4]   Single machine scheduling with common due date assignment in a group technology environment [J].
Chen, DW ;
Li, S ;
Tang, GC .
MATHEMATICAL AND COMPUTER MODELLING, 1997, 25 (03) :81-90
[5]   Some scheduling problems with deteriorating jobs and learning effects [J].
Cheng, T. C. E. ;
Wu, Chin-Chia ;
Lee, Wen-Chiung .
COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 54 (04) :972-982
[6]   A concise survey of scheduling with time-dependent processing times [J].
Cheng, TCE ;
Ding, Q ;
Lin, BMT .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 152 (01) :1-13
[7]   A mutually beneficial coordination mechanism for a one-supplier multi-retailers supply chain [J].
Chiou, Chuang-Chun ;
Yao, Ming-Jong ;
Tsai, Jenteng .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 108 (1-2) :314-328
[8]  
GUO AX, 2005, INT J PURE APPL MATH, V18, P225
[9]   SINGLE FACILITY SCHEDULING WITH NONLINEAR PROCESSING TIMES [J].
GUPTA, JND ;
GUPTA, SK .
COMPUTERS & INDUSTRIAL ENGINEERING, 1988, 14 (04) :387-393
[10]  
Ham I, 1985, GROUP TECHNOLOGY APP