Best practices of organizational change for adopting alternative project delivery methods in the AEC industry

被引:9
作者
Aldossari, Khaled Medath [1 ,2 ]
Lines, Brian C. [3 ]
Smithwick, Jake B. [4 ]
Hurtado, Kristen C. [1 ]
Sullivan, Kenneth T. [1 ]
机构
[1] Arizona State Univ, Sch Sustainable Engn & Build Environm, Tempe, AZ 85281 USA
[2] Prince Sattam Bin Abdulaziz Univ, Coll Civil Engn, Al Kharj, Saudi Arabia
[3] Univ Kansas, Dept Civil Environm & Architectural Engn, Lawrence, KS 66045 USA
[4] Univ N Carolina, Dept Engn Technol & Construct Management, Charlotte, NC 28223 USA
关键词
Organizational change; Change management practices; AEC owner organization; TOTAL QUALITY MANAGEMENT; UNITED-STATES; CONSTRUCTION; IMPLEMENTATION; BIM; TECHNOLOGIES; ANTECEDENTS; DRIVERS; SYSTEMS;
D O I
10.1108/ECAM-03-2020-0166
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Although numerous studies have examined alternative project delivery methods (APDMs), most of these studies have focused on the relationship between these methods and improved project performance. Limited research identifies how to successfully add these methods within architectural, engineering and construction (AEC) organizations. The purpose of this paper is to identifying organizational change management (OCM) practices that, when effectively executed, lead to increased success rates of adopting APDMs in owner AEC organizations. Design/methodology/approach Seven OCM practices were identified through a comprehensive literature review. Then, through a survey of 140 individuals at 98 AEC organizations, the relationships between OCM practices and organizational adoption of APDMs were established. Findings The findings indicate that OCM practices with the strongest relationship to successful APDM adoption are realistic timeframe, effective change agents, workloads adjustments, senior-leadership commitment and sufficient change-related training. Practical implications Adopting APDMs can be extremely difficult and requires significant organizational change efforts to ensure the change is a success. Organizations that are implementing APDMs for the first time should consider applying the OCM practices that this study identifies as most related to successful APDM adoption. Originality/value This study contributes to the existing body of knowledge by identifying the OCM practices that are most significantly associated with successfully adopting APDMs.
引用
收藏
页码:1060 / 1082
页数:23
相关论文
共 68 条
[1]  
Ahn M.J., 2004, J LEADERSH ORG STUD, V10, P112, DOI [10.1177/107179190401000409, DOI 10.1177/107179190401000409]
[2]  
Alvesson M., 2012, Understanding organizational culture, V2nd
[3]   Technology adoption in the BIM implementation for lean architectural practice [J].
Arayici, Y. ;
Coates, P. ;
Koskela, L. ;
Kagioglou, M. ;
Usher, C. ;
O'Reilly, K. .
AUTOMATION IN CONSTRUCTION, 2011, 20 (02) :189-195
[4]   Barriers to public private partnership projects in developing countries A case of Nigeria [J].
Babatunde, Solomon Olusola ;
Perera, Srinath ;
Zhou, Lei ;
Udeaja, Chika .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2015, 22 (06) :669-691
[5]   How to measure the benefits of BIM - A case study approach [J].
Barlish, Kristen ;
Sullivan, Kenneth .
AUTOMATION IN CONSTRUCTION, 2012, 24 :149-159
[6]   Innovation in small, project-based construction firms [J].
Barrett, Peter ;
Sexton, Martin .
BRITISH JOURNAL OF MANAGEMENT, 2006, 17 (04) :331-346
[7]  
Beer M, 2000, HARVARD BUS REV, V78, P133
[8]  
Burati J.L., 1993, Journal of Management in Engineering, V9, P456
[9]   Organisational Change Management: A Critical Review [J].
By, Rune .
JOURNAL OF CHANGE MANAGEMENT, 2005, 5 (04) :369-380
[10]   Drivers for Adopting Public Private Partnerships-Empirical Comparison between China and Hong Kong Special Administrative Region [J].
Chan, Albert P. C. ;
Lam, Patrick T. I. ;
Chan, Daniel W. M. ;
Cheung, Esther ;
Ke, Yongjian .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (11) :1115-1124