Contractors' views of the potential causes of inconsistencies between design and construction in Saudi Arabia

被引:27
作者
Arain, FM
Pheng, LS
Assaf, SA
机构
[1] Natl Univ Singapore, Sch Design & Environm, Dept Bldg, Singapore 117566, Singapore
[2] King Fahd Univ Petr & Minerals, Coll Environm Design, Construct Engn & Management Dept, Dhahran 31261, Saudi Arabia
关键词
D O I
10.1061/(ASCE)0887-3828(2006)20:(74)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The study identifies the causes of inconsistencies between the design and construction of large building projects. To achieve the study objectives, a questionnaire survey was carried out to collect information on potential causes of inconsistencies at the project design and construction interface. Responses from 27 contractors were analyzed. The results suggest that the involvement of designer as consultant, communication gap between constructor and designer, insufficient working drawing details, lack of coordination between parties, lack of human resources in design firm, lack of designer's knowledge of available materials and equipment, and incomplete plans and specifications were considered as the most important causes of the project design and construction interface inconsistencies. On the other hand, project management as a professional service, weather conditions, nationalities of participants, involvement of the contractor in design conceptual phase, unforeseen problems, involvement of the contractor in design development phase, and government regulations were the least important causes of inconsistencies between professionals at the project design and construction interface in large building projects.
引用
收藏
页码:74 / 83
页数:10
相关论文
共 23 条
[1]  
ADRIAN JJ, 1983, BUILDING CONSTRUCTIO
[2]  
Al-Hammad A.M., 2000, J. Perform. Constr. Fac, V14, P71
[3]  
ALDUBAISI AH, 2000, THESIS FAHD U PETROL
[4]  
ALGHAMDI A, 1999, THESIS FAHD U PETROL
[5]  
ALHAZMI MHS, 1987, THESIS FAHD U PETROL
[6]  
ALMANSOURI OH, 1988, THESIS U READING ENG
[7]  
ALYOUSIF FA, 2001, THESIS U PETROLEUM M
[8]  
ARAIN FM, 2002, THESIS FAHD U PETROL
[9]  
Assaf S., 1996, J PERFORM CONSTR FAC, V10, DOI DOI 10.1061/(ASCE)0887-3828(1996)10:4(171)
[10]  
Assaf S.A., 1988, T AM ASS COST ENG, P63