Production planning and control for remanufacturing: literature review and analysis

被引:103
作者
Lage Junior, Muris [1 ]
Godinho Filho, Moacir [2 ]
机构
[1] Univ Fed Goias, Dept Ind Engn, BR-75704020 Catalao, Go, Brazil
[2] Univ Fed Sao Carlos, Dept Ind Engn, BR-13565905 Sao Carlos, SP, Brazil
关键词
production planning and control; remanufacturing; review; LOT SCHEDULING PROBLEM; INVENTORY SYSTEM; MANUFACTURING/REMANUFACTURING SYSTEM; PERFORMANCE ANALYSIS; OPTIMAL POLICY; MODEL; RECOVERY; CAPACITY; IMPACT; OPTIMIZATION;
D O I
10.1080/09537287.2011.561815
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This article reviews the literature on production planning and control (PPC) for remanufacturing. The objectives are threefold: to determine whether the gaps identified by Guide (Guide Jr, V. D. R., 2000. Production planning and control for remanufacturing: industry practice and research needs. Journal of Operations Management, 18, 467-483) on the subject with respect to the main complicating characteristics of remanufacturing have been fulfilled; to classify the literature based on an appropriate structure to obtain a better understanding of the subject identifying sources of future research and to provide a useful source for scholars and practitioners. Seventy-six papers were examined and classified. It was found that none of the studies deals simultaneously with all of the complicating characteristics, and that more practical research is needed. In addition it was found that we lack studies regarding forecasting and aggregate planning considering disassembly of returned products, material matching restrictions or stochastic routings, master production scheduling considering material matching restrictions or stochastic routings, ordering system and capacity planning considering material matching restrictions and inventory control and management considering stochastic routings.
引用
收藏
页码:419 / 435
页数:17
相关论文
共 86 条
[1]  
Aksoy H.K., 2001, P SPIE INT C ENVIRON, P167
[2]   Remanufacturing control in multistage systems with Stochastic recovery rates [J].
Aksoy, HK ;
Gupta, SM .
ENVIRONMENTALLY CONSCIOUS MANUFACTURING IV, 2004, 5583 :264-273
[3]   Buffer allocation plan for a remanufacturing cell [J].
Aksoy, HK ;
Gupta, SA .
COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 48 (03) :657-677
[4]  
[Anonymous], COMPUTERS IND ENG
[5]  
[Anonymous], P 6 INT C INT SYST D
[6]  
[Anonymous], GECCO 05 25 29 JUN W
[7]  
[Anonymous], COMPUTERS IND ENG
[8]   The effect of categorizing returned products in remanufacturing [J].
Aras, N ;
Boyaci, T ;
Verter, V .
IIE TRANSACTIONS, 2004, 36 (04) :319-331
[9]  
Aras N, 2006, PROD OPER MANAG, V15, P528, DOI 10.1111/j.1937-5956.2006.tb00161.x
[10]  
Ayres R., 1997, European Management Journal, V15, P557, DOI DOI 10.1016/S0263-2373(97)00035-2