Construction Method Models Using Context Aware Construction Requirements for Automated Schedule Generation

被引:0
|
作者
Yeoh, Justin K. W. [1 ]
Nguyen, T. Q. [2 ]
Abbott, Ernest L. S. [3 ]
机构
[1] Natl Univ Singapore, Dept Civil & Environm Engn, Block E1,3 Engn Dr 2,E2-05-06, Singapore 117576, Singapore
[2] Natl Univ Singapore, Dept Civil & Environm Engn, Block E1,3 Engn Dr 2,E1-08-21, Singapore 117576, Singapore
[3] Natl Univ Singapore, Dept Civil & Environm Engn, Block E2,1 Engn Dr 2,E1-08-21, Singapore 117576, Singapore
来源
COMPUTING IN CIVIL ENGINEERING 2017: SMART SAFETY, SUSTAINABILITY, AND RESILIENCE | 2017年
关键词
INFORMATION;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Scheduling is a mostly manual process, which is typically time consuming. To overcome this problem, researchers have developed various knowledge based, model based and case based representation approaches to automatically generate construction schedules. Despite the attention accorded by academics, the Architectural, Engineering and Construction (AEC) industry has been reluctant to adopt automatic schedule generation. Several reasons exist for this, of which one lies in being able to robustly generate feasible schedules under different project contexts. These contexts include differing project layouts, and schedule milestones. This failure has eroded the confidence of industry practitioners in employing automatic schedule generation tools; practitioners prefer to rely on manual methods rather than trust automated methods in which they perceive as having little control over. This paper proposes a rule based approach which explicitly accounts for project context through a query mechanism. These rules are defined from construction requirements which represent pre-requisite conditions for construction processes to occur. This approach makes several research contributions: Firstly, a construction method model based on construction requirements is introduced to link product and process models. Secondly, a query language is utilized to enable project information to be embedded in the construction requirement specification. The approach is validated on a subway construction project against an actual expert.
引用
收藏
页码:60 / 67
页数:8
相关论文
共 50 条
  • [1] Virtual construction for automated schedule generation
    Thabet, WY
    Wakefield, RR
    Waly, AF
    DURABILITY OF BUILDING MATERIALS AND COMPONENTS 8, VOLS 1-4, PROCEEDINGS, 1999, : 2939 - 2944
  • [2] Automated construction schedule optimisation using genetic algorithm
    Srimathi K.R.
    Padmarekha A.
    Anandh K.S.
    Asian Journal of Civil Engineering, 2023, 24 (8) : 3521 - 3528
  • [3] Construction of detailed mechanistic models using automated mechanism generation.
    Broadbelt, LJ
    Haubein, NC
    Wong, HW
    Zhang, QZ
    Khan, S
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2002, 223 : C96 - C96
  • [4] Construction risk identification using a multi-sentence context-aware method
    Gao, Nan
    Touran, Ali
    Wang, Qi
    Beauchamp, Nicholas
    AUTOMATION IN CONSTRUCTION, 2024, 164
  • [5] Construction schedule augmentation with implicit dependency constraints and automated generation of lookahead plan revisions
    Amer, Fouad
    Jung, Yoonhwa
    Golparvar-Fard, Mani
    AUTOMATION IN CONSTRUCTION, 2023, 152
  • [6] Generation, visualization, and evaluation schedule of repetitive construction projects using GIS
    Tomar, Anjul
    Bansal, V. K.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (06) : 1104 - 1119
  • [7] A method of automated landmark generation for automated 3D PDM construction
    Brett, AD
    Taylor, CJ
    IMAGE AND VISION COMPUTING, 2000, 18 (09) : 739 - 748
  • [8] Interoperability requirements for automated manufacturing systems in construction
    Tibaut, Andrej
    Rebolj, Danijel
    Perc, Matjaz Nekrep
    JOURNAL OF INTELLIGENT MANUFACTURING, 2016, 27 (01) : 251 - 262
  • [9] Interoperability requirements for automated manufacturing systems in construction
    Andrej Tibaut
    Danijel Rebolj
    Matjaž Nekrep Perc
    Journal of Intelligent Manufacturing, 2016, 27 : 251 - 262
  • [10] Automated generation of context-aware tests
    Wang, Zhimin
    Elbaum, Sebastian
    Rosenblum, David S.
    ICSE 2007: 29TH INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING, PROCEEDINGS, 2007, : 406 - +