A numerical study of stress changes in barrier pillars and a border area in a longwall coal mine

被引:104
|
作者
Shabanimashcool, Mahdi [1 ]
Li, Charlie C. [1 ]
机构
[1] Norwegian Univ Sci & Technol NTNU, Dept Geol & Mineral Resource Engn, Trondheim, Norway
关键词
Longwall mining; Numerical modelling; Barrier pillars; Large-scale numerical modelling; Stress changes; STABILITY;
D O I
10.1016/j.coal.2012.12.008
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In longwall mining, stope voids are filled by caved-in rock materials. Cave-in and fracturing of roof strata cause severe disturbance to and stress changes in the host rocks. The study site is the Svea Nord coal mine. Longwall mining method was implemented to extract coal at the study site. It is intended that the coal in the border area on one side of the longwall panels will be mined after completion of the longwall mining. There is a concern about how the longwall mining affects the stress state in the border area and how the stress changes would affect future mining in the border area. 3D numerical modelling was conducted to consider the above concerns. Two models were constructed in the study. The first one is a local model that includes only two panels to study how the stresses in the barrier pillars are changed during panel mining. The second one is a mine-scale global model that includes all the panels with the aim of studying the disturbance to the border area by the longwall mining. The simulations show that the stresses in the barrier pillars fluctuate up and down during mining because of periodic cave-in events behind the longwall face. A failure zone of about 12 m exists in the wall of the barrier pillar. A large portion of the barrier pillar is still intact and is thus capable of protecting the border area. A disturbed zone of about 20 m is found to have developed in the wall of the main tunnels on the side of the border area after all the longwall panels have been mined out. The stress state in the remaining portion of the border area remains unchanged. Therefore, by considering a pillar with width of 25-35 m into the border area along the access tunnels, it will be possible to mine the rest of the border area with room-and-pillar method in the future. (C) 2013 Elsevier B.V. All rights reserved.
引用
收藏
页码:39 / 47
页数:9
相关论文
共 50 条
  • [21] Experimental and Numerical Investigation of the Effect of Integration of a Flooded-Bed Scrubber into a Longwall Shearer on Airflow along a Coal Mine Longwall Face
    Arya, Sampurna
    Novak, Thomas
    Sottile, Joseph
    APPLIED SCIENCES-BASEL, 2021, 11 (08):
  • [22] Numerical Analysis of Longwall Gate-Entry Stability under Weak Geological Condition: A Case Study of an Indonesian Coal Mine
    Sasaoka, Takashi
    Mao, Pisith
    Shimada, Hideki
    Hamanaka, Akihiro
    Oya, Jiro
    ENERGIES, 2020, 13 (18)
  • [23] Numerical Study on Soft Coal Pillar Stability in an Island Longwall Panel
    Xu, Qingyun
    Bai, Jian-Biao
    Yan, Shuai
    Wang, Rui
    Wu, Shaoxu
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [24] Similarity simulation study on displacement and stress changes response to coal mining in Longdong coal mine, China
    Huang, Kai
    Xu, Long
    Zha, Fusheng
    Lu, Zhitang
    Wu, Jiwen
    Chu, Chengfu
    Yu, Chuang
    QUARTERLY JOURNAL OF ENGINEERING GEOLOGY AND HYDROGEOLOGY, 2021, 54 (04)
  • [25] A case study on longwall mining near shale gas wells in barrier pillars - influence, safety, and risks
    Zhang, Peter
    Su, Daniel
    Dougherty, Heather
    Kimutis, Robert
    Schatzel, Steve
    Lu, Jun
    54th U.S. Rock Mechanics/Geomechanics Symposium, 2020,
  • [26] Chain pillar optimization at a longwall coal mine based on field monitoring results and numerical model analysis
    Qingwen Shi
    Gang Xu
    Defeng Wang
    Zhengjie Li
    Wangrong Liu
    Xiao Wang
    Arabian Journal of Geosciences, 2021, 14 (23)
  • [27] Study on the Instability Mechanism and Control Measures of a Roadway in a Mine with Retained Coal Pillars and Close Coal Seams
    Liu, Huai-Qian
    Wang, Lei
    Han, Lian-Chang
    Liu, Ping
    Zou, Peng
    SHOCK AND VIBRATION, 2021, 2021
  • [28] Numerical investigation into effect of rear barrier pillar on stress distribution around a longwall face
    鞠明和
    李学华
    姚强岭
    李冬伟
    种照辉
    周健
    JournalofCentralSouthUniversity, 2015, 22 (11) : 4372 - 4384
  • [29] Numerical investigation into effect of rear barrier pillar on stress distribution around a longwall face
    Ming-he Ju
    Xue-hua Li
    Qiang-ling Yao
    Dong-wei Li
    Zhao-hui Chong
    Jian Zhou
    Journal of Central South University, 2015, 22 : 4372 - 4384
  • [30] Numerical investigation into effect of rear barrier pillar on stress distribution around a longwall face
    Ju Ming-he
    Li Xue-hua
    Yao Qiang-ling
    Li Dong-wei
    Chong Zhao-hui
    Zhou Jian
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2015, 22 (11) : 4372 - 4384