An application of genetic algorithm and the Serial Schedule Generation Scheme for solving the Resource-Constrained Project Scheduling Problem

被引:0
|
作者
de Melo, Erickssen B. [1 ]
de Melo Junior, Gilberto [1 ]
Calixto, Wesley P. [2 ]
Reis, Marcio R. C. [3 ]
机构
[1] Univ Fed Goias, Elect Engn Sch, Goiania, Go, Brazil
[2] Fed Inst Goias, Ind Automat, Goiania, Go, Brazil
[3] Fed Inst Goias, Ind Automat, Senador Canedo, Brazil
来源
2017 CHILEAN CONFERENCE ON ELECTRICAL, ELECTRONICS ENGINEERING, INFORMATION AND COMMUNICATION TECHNOLOGIES (CHILECON) | 2017年
关键词
Resource-Constrained Project Scheduling Problem; Genetic Algorithm; Cuckoo Search; Project Management; Serial Schedule Generation Scheme;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This article presents a way to solve Resource-Constrained Project Scheduling Problem with genetic algorithm and demonstrates the high relevance of metaheuristics for solution this type problem. Also shows various benchmarks with others heuristics. The benchmark performed compares directly to a relatively new heuristic and to several other works performed. The genetic algorithm together with the approach and the form of resolution applied to solve the Resource-Constrained Project Scheduling Problem obtained better results than other approaches. This work reinforced that, even with new metaheuristics, the genetic algorithm remains in the lead to solve this problem.
引用
收藏
页数:6
相关论文
共 50 条
  • [41] Improved discrete cuckoo search for the resource-constrained project scheduling problem
    Bibiks, Kirils
    Hu, Yim-Fun
    Li, Jian-Ping
    Pillai, Prashant
    Smith, Aleister
    APPLIED SOFT COMPUTING, 2018, 69 : 493 - 503
  • [42] A dynamic population steady-state genetic algorithm for the resource-constrained project scheduling problem
    Cervantes, Mariamar
    Lova, Antonio
    Tormos, Pilar
    Barber, Federico
    NEW FRONTIERS IN APPLIED ARTIFICIAL INTELLIGENCE, 2008, 5027 : 611 - +
  • [43] LSSPER: Solving the resource-constrained project scheduling problem with large neighbourhood search
    Palpant, M
    Artigues, C
    Michelon, P
    ANNALS OF OPERATIONS RESEARCH, 2004, 131 (1-4) : 237 - 257
  • [44] LSSPER: Solving the Resource-Constrained Project Scheduling Problem with Large Neighbourhood Search
    Mireille Palpant
    Christian Artigues
    Philippe Michelon
    Annals of Operations Research, 2004, 131 : 237 - 257
  • [45] A genetic algorithm for the resource constrained multi-project scheduling problem
    Goncalves, J. F.
    Mendes, J. J. M.
    Resende, M. G. C.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) : 1171 - 1190
  • [46] A genetic algorithm with local search using activity list characteristics for solving resource-constrained project scheduling problem with multiple modes
    Okada, Ikutaro
    Takahashi, Koji
    Zhang, Wenqiang
    Zhang, Xiaofu
    Yang, Hongyu
    Fujimura, Shigeru
    IEEJ TRANSACTIONS ON ELECTRICAL AND ELECTRONIC ENGINEERING, 2014, 9 (02) : 190 - 199
  • [47] A genetic algorithm-based method for solving multi-mode resource-constrained project scheduling problem in uncertain environment
    Khalilzadeh, Mohammad
    Hosseini, Seyyed Hajir
    Ghaeli, Reza
    JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (02) : 79 - 86
  • [48] A Tool for Comparing Resource-Constrained Project Scheduling Problem Algorithms
    Olteanu, Alexandru-Liviu
    AIC '09: PROCEEDINGS OF THE 9TH WSEAS INTERNATIONAL CONFERENCE ON APPLIED INFORMATICS AND COMMUNICATIONS: RECENT ADVANCES IN APPLIED INFORMAT AND COMMUNICATIONS, 2009, : 182 - +
  • [49] Solving multi-mode resource-constrained scheduling problem of prefabricated construction using genetic algorithm
    Xie, Lin-lin
    Li, Denghe
    Wu, Sisi
    Chang, Rui-Dong
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2025,
  • [50] Solving NPV-Based Resource Constrained Project Scheduling Problem Using Genetic Algorithm
    Phuntsho, Tshewang
    Gonsalves, Tad
    2022 10TH INTERNATIONAL CONFERENCE ON INFORMATION AND EDUCATION TECHNOLOGY (ICIET 2022), 2022, : 409 - 414