共 50 条
- [33] Resource-Constrained Project Scheduling Problem with Flexible Work Profiles: A Genetic Algorithm Approach SCIENTIA IRANICA TRANSACTION E-INDUSTRIAL ENGINEERING, 2010, 17 (01): : 25 - 35
- [36] A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling WCECS 2009: WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, VOLS I AND II, 2009, : 730 - +
- [37] Hybrid solution method for resource-constrained project scheduling problem using a new schedule generator The International Journal of Advanced Manufacturing Technology, 2013, 66 : 1171 - 1180