共 50 条
- [21] Memetic algorithm for the resource-constrained project scheduling problem 2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 4991 - 4996
- [25] Effective genetic algorithm for resource-constrained project scheduling with limited preemptions International Journal of Machine Learning and Cybernetics, 2011, 2 : 55 - 65
- [29] An estimation of distribution algorithm for resource-constrained project scheduling problem 2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5, 2010, : 265 - 270
- [30] Optimization of Resource-Constrained Multi-Project Scheduling Problem based on the genetic algorithm 2018 15TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT (ICSSSM), 2018,