Safety Comprehensive Evaluation of Spacecraft Assembly Process Based on Grey-Fuzzy Method

被引:2
作者
Tian, Jin [1 ]
Fu, Ju [1 ]
机构
[1] Beihang Univ, Beijing 100191, Peoples R China
关键词
ANALYTIC HIERARCHY PROCESS; RELIABILITY-ANALYSIS; SYSTEM BEHAVIOR; RISK ANALYSIS; NETWORK; MODEL;
D O I
10.1155/2014/383414
中图分类号
O414.1 [热力学];
学科分类号
摘要
Multilevel evaluation indicator system for spacecraft assembly safety was built, considering six aspects: operators, process equipment, operating environment, operation types, objects to be operated, and emergency measures. Based on that, a grey-fuzzy comprehensive evaluation approach was proposed to support the spacecraft assembly safety evaluation. In the approach, analytic hierarchy process and grey degree were applied to construct weight matrix, and the principle with which the appropriate memberships could be determined was taken as a basis for creation of grey-fuzzy comprehensive evaluation matrix. The docking assembly, a typical stage in spacecraft assembly process, was taken as the case study to evaluate its safety level by the proposed grey-fuzzy comprehensive evaluation method, and it was confirmed that the result is coherent with the reality of the accident statistics. The evaluation results can be utilized as a technical basis for developing safety and protective measures, perfecting risk management, and furthermore lowering the risk to minimize economic loss and behind-schedule of project.
引用
收藏
页数:9
相关论文
共 22 条
[1]  
China Aerospace Industry Corporation, 1998, 2574A98 QJ CHIN AER
[2]  
Commission of Science Technology and Industry for National Defense (COSTIND), 2005, 2204A2005 COSTIND GJ
[3]   Developing a fuzzy analytic hierarchy process (AHP) model for behavior-based safety management [J].
Dagdeviren, Metin ;
Yueksel, Ihsan .
INFORMATION SCIENCES, 2008, 178 (06) :1717-1733
[4]  
European Cooperation for Space Standardization, 2008, ECSSQ20B
[5]   Criticality evaluation of petrochemical equipment based on fuzzy comprehensive evaluation and a BP neural network [J].
Guo, Lijie ;
Gao, Jinji ;
Yang, Jianfeng ;
Kang, Jianxin .
JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2009, 22 (04) :469-476
[6]   A fuzzy optimization model for QFD planning process using analytic network approach [J].
Kahraman, C ;
Ertay, T ;
Büyüközkan, G .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 171 (02) :390-411
[7]   Tolerance allocation of assemblies using fuzzy comprehensive evaluation and decision support process [J].
Kumar, Abhishek ;
Choi, Seung-Kyum ;
Goksel, Lorens .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 55 (1-4) :379-391
[8]   Analysis and prediction of hazard risks caused by tropical cyclones in Southern China with fuzzy mathematical and grey models [J].
Liu, Hexiang ;
Zhang, Da-Lin .
APPLIED MATHEMATICAL MODELLING, 2012, 36 (02) :626-637
[9]  
Liu L., 2010, AEROSPACE MANUFACTUR, P52
[10]   On the use of fuzzy synthetic evaluation and optimal classification for computing fire risk ranking of buildings [J].
Liu, M. ;
Lo, S. M. ;
Hu, B. Q. ;
Zhao, C. M. .
NEURAL COMPUTING & APPLICATIONS, 2009, 18 (06) :643-652