Synthesis of multi-period heat exchanger networks based on features of sub-period durations

被引:17
作者
Kang, Lixia [1 ]
Liu, Yongzhong [1 ,2 ]
Wu, Le [1 ]
机构
[1] Xi An Jiao Tong Univ, Dept Chem Engn, Xian 710049, Shaanxi, Peoples R China
[2] Minist Educ, Key Lab Thermofluid Sci & Engn, Xian 710049, Shaanxi, Peoples R China
基金
中国国家自然科学基金;
关键词
Heat exchanger network; Multi-period operation; Unequal period duration; Shared heat exchanger; OPTIMIZATION; INTEGRATION; OPERATION; TEMPERATURES; DESIGN; PLANTS;
D O I
10.1016/j.energy.2016.06.047
中图分类号
O414.1 [热力学];
学科分类号
摘要
In this work, a representative sub-period method is proposed for synthesis of multi-period heat exchanger networks (HENs). For the multi-period HENs with a large number and significantly different durations of sub-periods, the sub-period with the longest duration is taken as the representative sub period. The cost-effective HEN structure in this representative sub-period can be obtained by solving the single-period HEN synthesis problems, and the operational parameters are then optimized to meet the requirements of other non-representative sub-periods on the fixed HEN structure achieved by the former step. In particular, for synthesis of multi-period of HENs with similar durations of sub-periods, a simplified model method is also proposed. In this method, the multi-period HENs are finalized by introducing the commonly shared heat exchangers in the multi-period HENs model. Both of the proposed methods avoid directly solving the multi-period HEN model, and hence the computational loads are reduced. An industrial case study for the synthesis of multi-period HENs is carried out to illustrate the procedure of the proposed methods. The effectiveness and advantages of the proposed methods are demonstrated by the comparison with the results obtained by the methods in literature. The effects of period duration on the cost-effectiveness of the multi-period HENs are discussed and highlighted. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1302 / 1311
页数:10
相关论文
共 50 条
[21]   Synthesis of multiperiod heat exchanger networks: Minimum utility consumption in each period [J].
Lakner, Rozalia ;
Orosz, Akos ;
How, Bing Shen ;
Friedler, Ferenc .
COMPUTERS & CHEMICAL ENGINEERING, 2022, 166
[22]   Multi-period analysis of heat integration measures in industrial clusters [J].
Bungener, Stephane ;
Hackl, Roman ;
Van Eetvelde, Greet ;
Harvey, Simon ;
Marechal, Francois .
ENERGY, 2015, 93 :220-234
[23]   Targeting industrial heat pump integration in multi-period problems [J].
Becker, Helen ;
Marechal, Francois .
11TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING, PTS A AND B, 2012, 31 :415-419
[24]   Modelling and optimisation for design of hydrogen networks for multi-period operation [J].
Ahmad, Muhammad Imran ;
Zhang, Nan ;
Jobson, Megan .
JOURNAL OF CLEANER PRODUCTION, 2010, 18 (09) :889-899
[25]   Multi-objective optimization of multi-period interplant heat integration using steam system [J].
Ma, Jiaze ;
Chang, Chenglin ;
Wang, Yufei ;
Feng, Xiao .
ENERGY, 2018, 159 :950-960
[26]   Synthesis of Large-scale Heat Exchanger Network Based on Sub-networks [J].
Guan, Xin ;
Guo, Zhibo ;
Tu, Wenjing .
APPLICATION OF CHEMICAL ENGINEERING, PTS 1-3, 2011, 236-238 :633-636
[27]   Graph theory based formulation of multi-period distribution expansion problems [J].
Popovic, Z. N. ;
Popovic, D. S. .
ELECTRIC POWER SYSTEMS RESEARCH, 2010, 80 (10) :1256-1266
[28]   Multi-Period Economic Dispatch Considering Combined Carbon and Electricity Networks [J].
Ding, Tao ;
Yang, Qingrun ;
Wang, Min ;
Wu, Zhongyu .
ELECTRIC POWER COMPONENTS AND SYSTEMS, 2018, 46 (10) :1171-1182
[29]   Modeling and solving the multi-period disruptions scheduling problem on urban networks [J].
Coco, Amadeu A. ;
Duhamel, Christophe ;
Santos, Andrea Cynthia .
ANNALS OF OPERATIONS RESEARCH, 2020, 285 (1-2) :427-443
[30]   Distributionally robust multi-period energy management for CCHP-based microgrids [J].
Shi, Zhichao ;
Liang, Hao ;
Dinavahi, Venkata .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2020, 14 (19) :4097-4107