A Critical Chain Project Scheduling Problem with Multi-mode

被引:0
|
作者
Peng, W. L. [1 ]
Jiao, Q. J. [1 ]
机构
[1] Shenyang Ligong Univ, Sch Econ & Management, Shenyang, Peoples R China
来源
ADVANCES IN MATERIALS MANUFACTURING SCIENCE AND TECHNOLOGY XIV | 2012年 / 697-698卷
关键词
Project management; Critical chain; Resource constrained project scheduling problem;
D O I
10.4028/www.scientific.net/MSF.697-698.541
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Critical chain method (CCM) is a new project method which combines project network technologies and management arts. Although there are lots of researches on it, the existing critical chain method has some drawbacks limiting its decision level in practical application. To improve the decision level and application range of critical chain method, the critical chain method with multi-mode is studied. The project network technology is the foundation of project scheduling problem. All the existing project management tools can only support single mode project network, that is, all the project activities have only one executive mode. We study the multi-mode project network as the foundation of multi-mode CC. Furthermore, by relating multi-mode project network to critical chain method, the critical chain method with multi-mode is presented, and the implementation procedure is proposed. In the implementation of multi-mode CCM, the activity priority rules and mode priority rules are investigated.
引用
收藏
页码:541 / 545
页数:5
相关论文
共 50 条
  • [1] Learning agents for the multi-mode project scheduling problem
    Wauters, T.
    Verbeeck, K.
    Vanden Berghe, G.
    De Causmaecker, P.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2011, 62 (02) : 281 - 290
  • [2] The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem
    Wauters, Tony
    Kinable, Joris
    Smet, Pieter
    Vancroonenburg, Wim
    Vanden Berghe, Greet
    Verstichel, Jannes
    JOURNAL OF SCHEDULING, 2016, 19 (03) : 271 - 283
  • [3] A genetic algorithm for multi-mode resource constrained project scheduling problem
    Mori, M
    Tseng, CC
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 100 (01) : 134 - 141
  • [4] A matheuristic approach to the multi-mode resource constrained project scheduling problem
    Fernandes, Gustavo Alves
    de Souza, Sergio Ricardo
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 162
  • [5] A multi-mode critical chain scheduling method based on priority rules
    Peng, Wuliang
    Huang, Min
    Hao Yongping
    PRODUCTION PLANNING & CONTROL, 2015, 26 (12) : 1011 - 1024
  • [6] Multi-mode resource-constrained project scheduling problem with alternative project structures
    Tao, Sha
    Dong, Zhijie Sasha
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 125 : 333 - 347
  • [7] Multi-mode multi-project scheduling problem for mould production in MC enterprise
    Shan Miyuan
    Qu Hong
    Wu Juan
    2007 INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-15, 2007, : 5316 - 5320
  • [8] Multi-mode resource constrained multi-project scheduling and resource portfolio problem
    Besikci, Umut
    Bilge, Umit
    Ulusoy, Gunduz
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 240 (01) : 22 - 31
  • [9] BPGA-EDA for the Multi-Mode Resource Constrained Project Scheduling Problem
    Ayodele, Mayowa
    McCall, John
    Regnier-Coudert, Olivier
    2016 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2016, : 3417 - 3424
  • [10] Estimation of Distribution Algorithms for the Multi-Mode Resource Constrained Project Scheduling Problem
    Ayodele, Mayowa
    McCall, John
    Regnier-Coudert, Olivier
    2017 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2017, : 1579 - 1586