Performance evaluation of an automated material handling system for a wafer fab

被引:25
作者
Wang, FK
Lin, JT
机构
[1] Natl Taipei Univ Technol, Dept Ind Engn & Management, Taipei 10626, Taiwan
[2] Natl Tsing Hua Univ, Dept Ind Engn & Engn Management, Hsinchu, Taiwan
关键词
AMHS; interbay; intrabay; performance evaluation; simulation;
D O I
10.1016/j.rcim.2003.08.002
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Discrete-event simulation model was developed to evaluate the performance of an automated material handling system (AMHS) for a wafer fab with a zone control scheme avoiding all vehicle collision. The layout of this AMHS is a custom configuration. The track option contains turntables, turnouts and high-speed express lanes. The behavior of the interarrival for all stockers from the real data set was analyzed to verify the assumption of the simulation model. The results show that the underlying distributions of most stockers for interarrival times belong to the exponential or Weibull distribution. The simulation results show that the number of vehicles significantly affects the average delivery time and the average throughput. A simple one-factor response surface model is used to determine the appropriate vehicle numbers. This study was also investigated to determine the vehicle numbers in an automated guided vehicle-based intrabay material handling system. (C) 2003 Elsevier Ltd. All rights reserved.
引用
收藏
页码:91 / 100
页数:10
相关论文
共 15 条
[1]   Performance analysis of automated interbay material-handling and storage systems for large Wafer Fab [J].
Cardarelli, G ;
Pelagagge, PM ;
Granito, A .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 1996, 12 (03) :227-234
[2]  
Cardarelli G., 1993, Assembly Automation, V13, P25, DOI 10.1108/eb004391
[3]   SIMULATION TOOL FOR DESIGN AND MANAGEMENT OPTIMIZATION OF AUTOMATED INTERBAY MATERIAL HANDLING AND STORAGE-SYSTEMS FOR LARGE WAFER-FAB [J].
CARDARELLI, G ;
PELAGAGGE, PM .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 1995, 8 (01) :44-49
[4]  
Colvin TD, 1998, SOLID STATE TECHNOL, V41, P161
[5]  
DAVIS F, 1995, SEMICOND INT, V18, P3
[6]  
JEFFERSON T, 1996, P 1996 WINT SIM C, P1008
[7]   Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab [J].
Lin, JT ;
Wang, FK ;
Yen, PY .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (06) :1221-1238
[8]   Connecting transport AMHS in a wafer fab [J].
Lin, JT ;
Wang, FK ;
Wu, CK .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (03) :529-544
[9]  
LIN JT, 2003, SIMULATION ANAL 300
[10]  
LIN JT, 2003, IEEE T SEMICONDUCT M, V16, P1