Scheduling of unrelated parallel machines with limited server availability on multiple production locations: a case study in knitted fabrics

被引:17
|
作者
Kerkhove, Louis-Philippe [1 ]
Vanhoucke, Mario [1 ,2 ,3 ]
机构
[1] Univ Ghent, Fac Econ & Business Adm, B-9000 Ghent, Belgium
[2] Vlerick Business Sch, Technol & Operat Management Area, Ghent, Belgium
[3] UCL, Dept Management Sci & Innovat, London, England
关键词
parallel machine scheduling; geographically dispersed production locations; hybrid meta-heuristic; changeover interference; case study; SEQUENCE-DEPENDENT SETUP; GENETIC ALGORITHM; MAXIMUM LATENESS; SINGLE-SERVER; TARDINESS; TIMES; EARLINESS; MAKESPAN; HEURISTICS; NETWORK;
D O I
10.1080/00207543.2013.865855
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper studies a complex variation of the parallel machine scheduling (PMS) problem, as encountered at a Belgian producer of knitted fabrics. The aim is to assign N J jobs to N M unrelated parallel machines, minimising a weighted combination of job lateness and tardiness. Jobs are assigned specific release, and due dates and changeover times are sequence dependent. Current literature is extended by including geographically dispersed production locations, which influence job due dates and objective function coefficients. Furthermore, the changeover interference due to limited availability of technicians is also studied in this paper. The scheduling problem is solved using a hybrid meta-heuristic, which combines elements from simulated annealing and genetic algorithms. This hybrid meta-heuristic is capable of solving real-scale scheduling problems of up to 750 jobs, 75 machines and 10 production locations within reasonable computation time. This hybrid scheduling procedure is extended with heuristic dispatching rules capable of reducing the impact of changeover interference by 23% on average compared to the random scenario, for the case where a single technician is expected to serve up to 12 machines.
引用
收藏
页码:2630 / 2653
页数:24
相关论文
共 47 条
  • [31] A Benders decomposition approach to the weighted number of tardy jobs scheduling problem on unrelated parallel machines with production costs
    M'Hallah, R.
    Al-Khamis, T.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (19) : 5977 - 5987
  • [32] On solving the unrelated parallel machine scheduling problem: active microrheology as a case study
    Orts, F.
    Ortega, G.
    Puertas, A. M.
    Garcia, I
    Garzon, E. M.
    JOURNAL OF SUPERCOMPUTING, 2020, 76 (11): : 8494 - 8509
  • [33] On solving the unrelated parallel machine scheduling problem: active microrheology as a case study
    F. Orts
    G. Ortega
    A. M. Puertas
    I. García
    E. M. Garzón
    The Journal of Supercomputing, 2020, 76 : 8494 - 8509
  • [34] Solving a bi-objective unrelated parallel batch processing machines scheduling problem: A comparison study
    Shahidi-Zadeh, B.
    Tavakkoli-Moghaddam, R.
    Taheri-Moghadam, A.
    Rastgar, I.
    COMPUTERS & OPERATIONS RESEARCH, 2017, 88 : 71 - 90
  • [35] Advanced scheduling model for unrelated parallel machines problem with job-sequence dependent setup times, availability constraints and time windows
    Agárdi, Anita
    Nehéz, Károly
    Academic Journal of Manufacturing Engineering, 2020, 18 (02): : 20 - 27
  • [36] Comparative analysis of scheduling rules through arena for parallel machines A case study
    Teixeira, Filipa de Oliveira
    Oliveira, Lara
    Varela, Leonilde R.
    2014 SIXTH WORLD CONGRESS ON NATURE AND BIOLOGICALLY INSPIRED COMPUTING (NABIC), 2014, : 170 - 175
  • [37] Bi-Objective Optimal Scheduling With Raw Material's Shelf-Life Constraints in Unrelated Parallel Machines Production
    Wang, Ming-Zheng
    Zhang, Ling-Ling
    Choi, Tsan-Ming
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2020, 50 (11): : 4598 - 4610
  • [38] Capacitated lot sizing and scheduling with parallel machines and shared buffers: A case study in a packaging company
    Fabrizio Marinelli
    Maria Elena Nenni
    Antonio Sforza
    Annals of Operations Research, 2007, 150 : 177 - 192
  • [39] Capacitated lot sizing and scheduling with parallel machines and shared buffers: A case study in a packaging company
    Marinelli, Fabrizio
    Nenni, Maria Elena
    Sforza, Antonio
    ANNALS OF OPERATIONS RESEARCH, 2007, 150 (01) : 177 - 192
  • [40] Makespan minimization for two parallel machines scheduling with a periodic availability constraint: Mathematical programming model, average-case analysis, and anomalies
    Xu, Dehua
    Yang, Dar-Li
    APPLIED MATHEMATICAL MODELLING, 2013, 37 (14-15) : 7561 - 7567