Scheduling of unrelated parallel machines with limited server availability on multiple production locations: a case study in knitted fabrics

被引:17
|
作者
Kerkhove, Louis-Philippe [1 ]
Vanhoucke, Mario [1 ,2 ,3 ]
机构
[1] Univ Ghent, Fac Econ & Business Adm, B-9000 Ghent, Belgium
[2] Vlerick Business Sch, Technol & Operat Management Area, Ghent, Belgium
[3] UCL, Dept Management Sci & Innovat, London, England
关键词
parallel machine scheduling; geographically dispersed production locations; hybrid meta-heuristic; changeover interference; case study; SEQUENCE-DEPENDENT SETUP; GENETIC ALGORITHM; MAXIMUM LATENESS; SINGLE-SERVER; TARDINESS; TIMES; EARLINESS; MAKESPAN; HEURISTICS; NETWORK;
D O I
10.1080/00207543.2013.865855
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper studies a complex variation of the parallel machine scheduling (PMS) problem, as encountered at a Belgian producer of knitted fabrics. The aim is to assign N J jobs to N M unrelated parallel machines, minimising a weighted combination of job lateness and tardiness. Jobs are assigned specific release, and due dates and changeover times are sequence dependent. Current literature is extended by including geographically dispersed production locations, which influence job due dates and objective function coefficients. Furthermore, the changeover interference due to limited availability of technicians is also studied in this paper. The scheduling problem is solved using a hybrid meta-heuristic, which combines elements from simulated annealing and genetic algorithms. This hybrid meta-heuristic is capable of solving real-scale scheduling problems of up to 750 jobs, 75 machines and 10 production locations within reasonable computation time. This hybrid scheduling procedure is extended with heuristic dispatching rules capable of reducing the impact of changeover interference by 23% on average compared to the random scenario, for the case where a single technician is expected to serve up to 12 machines.
引用
收藏
页码:2630 / 2653
页数:24
相关论文
共 47 条
  • [1] On the complexity of scheduling unrelated parallel machines with limited preemptions
    Lenstra, Jan Karel
    Vakhania, Nodari
    OPERATIONS RESEARCH LETTERS, 2023, 51 (02) : 187 - 189
  • [2] Scheduling of unrelated parallel machines when machine availability is specified
    Suresh, V
    Chaudhuri, D
    PRODUCTION PLANNING & CONTROL, 1996, 7 (04) : 393 - 400
  • [3] Scheduling of unrelated parallel machines when machine availability is specified
    Suresh, V.
    Chaudhuri, Dipak
    Production Planning and Control, 1996, 7 (04): : 393 - 400
  • [4] Production scheduling on parallel machines: A case study
    Hegde, G.G.
    Kalathur, S.
    Tadikamalla, P.R.
    Maurer, J.
    Abraham, K.P.
    Omega, 1998, 26 (01): : 63 - 73
  • [5] Production scheduling on parallel machines: a case study
    Hegde, GG
    Kalathur, S
    Tadikamalla, PR
    Maurer, J
    Abraham, KP
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1998, 26 (01): : 63 - 73
  • [6] Scheduling unrelated parallel machines with a common server and sequence dependent setup times
    Raboudi, Houda
    Alpan, Gulgun
    Mangione, Fabien
    Tissot, Geoffrey
    Noel, Frederic
    IFAC PAPERSONLINE, 2022, 55 (10): : 2179 - 2184
  • [7] Multiple-objective heuristics for scheduling unrelated parallel machines
    Lin, Yang-Kuei
    Fowler, John W.
    Pfund, Michele E.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 227 (02) : 239 - 253
  • [8] Heuristic Approach to Unrelated Parallel Machines Scheduling under Availability and Resource Constraints
    Avdeenko, Tatiana V.
    Mezentsev, Yuriy A.
    Estraykh, Igor V.
    IFAC PAPERSONLINE, 2017, 50 (01): : 13096 - 13101
  • [9] Graph Balancing: A Special Case of Scheduling Unrelated Parallel Machines
    Tomáš Ebenlendr
    Marek Krčál
    Jiří Sgall
    Algorithmica, 2014, 68 : 62 - 80
  • [10] Graph Balancing: A Special Case of Scheduling Unrelated Parallel Machines
    Ebenlendr, Tomas
    Krcal, Marek
    Sgall, Jiri
    ALGORITHMICA, 2014, 68 (01) : 62 - 80