A semiotic framework to understand how signs in construction process simulations convey information

被引:13
作者
Hartmann, T. [1 ]
Vossebeld, N. [1 ]
机构
[1] Univ Twente, Dept Engn & Construct Management, VISICO Ctr, NL-7500 AE Enschede, Netherlands
关键词
4D CAD; Visualization; Semiotics; Building information modeling; Construction planning; Construction scheduling; 4D; MANAGEMENT; VISUALIZATION;
D O I
10.1016/j.aei.2013.04.001
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Planning the production sequence for a construction project requires the combination and transfer of information and knowledge from a large variety of areas. To support this knowledge combination and transfer, construction process visualizations, also referred to as 4D CAD, have proven to be valuable tools. Within these visualizations, signs, such as icons, indexes, or symbols, are often used to visualize contextual information related to the different construction activities. To understand the mechanisms of how these signs meaningfully convey such contextual information, this paper introduces a semiotic framework consisting of semiotic concepts, their definitions and relations. This paper also illustrates the power of the framework by applying it for analyzing the signs used in two construction process visualizations. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:378 / 385
页数:8
相关论文
共 27 条
[1]  
Andersen P., 1997, THEORY COMPUTER SEMI, V2
[2]   A review and outlook for a 'Building Information Model' (BIM): A multi-standpoint framework for technological development [J].
Cerovsek, Tomo .
ADVANCED ENGINEERING INFORMATICS, 2011, 25 (02) :224-244
[3]   Systematic procedure of determining an ideal color scheme on 4D models [J].
Chang, Han-Shuo ;
Kang, Shih-Chung ;
Chen, Po-Han .
ADVANCED ENGINEERING INFORMATICS, 2009, 23 (04) :463-473
[4]   4D dynamic construction management and visualization software: 2. Site trial [J].
Chau, KW ;
Anson, M ;
De Saram, DD .
AUTOMATION IN CONSTRUCTION, 2005, 14 (04) :525-536
[5]   Four-dimensional visualization of construction scheduling and site utilization [J].
Chau, KW ;
Anson, M ;
Zhang, JP .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (04) :598-606
[6]  
Christ R., HUMAN FACTORS J HUMA, V17
[7]  
Dreyfuss Henry., 1984, Symbol Sourcebook: An Authoritative Guide to International Graphic Symbols
[8]  
Easterby R., 1984, INFORM DESIGN, P91
[9]  
Harrison C, 2003, TECH COMMUN, V50, P46
[10]   Areas of application for 3D and 4D models on construction projects [J].
Hartmann, Timo ;
Gao, Ju ;
Fischer, Martin .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (10) :776-785