Automated Brick Counting for Facade Construction Progress Estimation

被引:24
作者
Hui, Linda [1 ]
Park, Man-Woo [2 ]
Brilakis, Ioannis [3 ]
机构
[1] Univ Cambridge, Dept Engn, Cambridge CB2 1PZ, England
[2] Myongji Univ, Dept Civil & Environm Engn, Yongin 449728, Gyeonggi Do, South Korea
[3] Univ Cambridge, Dept Engn, Construct Engn, Cambridge CB2 1PZ, England
基金
英国工程与自然科学研究理事会; 美国国家科学基金会;
关键词
Bricks; Automation; Imaging techniques; Computer aided vision systems; Information technology; Remote sensing;
D O I
10.1061/(ASCE)CP.1943-5487.0000423
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Construction progress is predominantly measured with manual site surveys. These surveys are labor-intensive, on-site manual investigations. The generated survey reports are subjective and approximate because they are based on the surveyors' individual experiences. This paper presents a novel method that can automatically count the number of bricks on a facade for reducing the cost and increasing the reliability of progress surveys. The method uses video data taken from a user's mobile phone to detect bricks on a facade in each video frame by using color thresholding, edge detection, and filtering of rectangular shapes and sizes. Then, it compares the difference between consecutive frames to add counts when new bricks appear and to avoid double counting. The proposed method was implemented and tested on on-site videos of red brick facades, and resulted in 99.8% precision and 98.7% recall. The results demonstrate the suitability of this method for progress monitoring of brick facade construction. (c) 2014 American Society of Civil Engineers.
引用
收藏
页数:12
相关论文
共 30 条
[1]   Lucas-Kanade 20 years on: A unifying framework [J].
Baker, S ;
Matthews, I .
INTERNATIONAL JOURNAL OF COMPUTER VISION, 2004, 56 (03) :221-255
[2]   Automated retrieval of 3D CAD model objects in construction range images [J].
Bosche, F. ;
Haas, C. T. .
AUTOMATION IN CONSTRUCTION, 2008, 17 (04) :499-512
[3]  
Bradski G., 2008, LEARNING OPENCV COMP
[4]   Progressive 3D reconstruction of infrastructure with videogrammetry [J].
Brilakis, Ioannis ;
Fathi, Habib ;
Rashidi, Abbas .
AUTOMATION IN CONSTRUCTION, 2011, 20 (07) :884-895
[5]   Comparison of Image-Based and Time-of-Flight-Based Technologies for Three-Dimensional Reconstruction of Infrastructure [J].
Dai, Fei ;
Rashidi, Abbas ;
Brilakis, Ioannis ;
Vela, Patricio .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (01) :69-79
[6]  
Department for Environment Food and Rural Affairs, 2011, WAST DAT OV
[7]   Material waste in building industry: Main causes and prevention [J].
Formoso, CT ;
Soibelman, L ;
De Cesare, C ;
Isatto, EL .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2002, 128 (04) :316-325
[8]   Visualization of Construction Progress Monitoring with 4D Simulation Model Overlaid on Time-Lapsed Photographs [J].
Golparvar-Fard, Mani ;
Pena-Mora, Feniosky ;
Arboleda, Carlos A. ;
Lee, SangHyun .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2009, 23 (06) :391-404
[9]  
Hartley R. I., 2004, Multiple View Geometry in Computer Vision, DOI 10.1016/S0143-8166(01)00145-2
[10]  
He Junji, 2010, Proceedings of the 2010 International Conference on Measuring Technology and Mechatronics Automation (ICMTMA 2010), P394, DOI 10.1109/ICMTMA.2010.798