Design of contract parameters in a closed-loop supply chain
被引:9
作者:
Dobos, Imre
论文数: 0引用数: 0
h-index: 0
机构:
Corvinus Univ Budapest, Inst Business Econ, H-1093 Budapest, HungaryCorvinus Univ Budapest, Inst Business Econ, H-1093 Budapest, Hungary
Dobos, Imre
[1
]
Gobsch, Barbara
论文数: 0引用数: 0
h-index: 0
机构:
European Univ Viadrina, Fac Business Adm & Econ, Frankfurt, Oder, GermanyCorvinus Univ Budapest, Inst Business Econ, H-1093 Budapest, Hungary
Gobsch, Barbara
[2
]
Pakhomova, Nadezhda
论文数: 0引用数: 0
h-index: 0
机构:
St Petersburg State Univ, Fac Econ, St Petersburg 199034, RussiaCorvinus Univ Budapest, Inst Business Econ, H-1093 Budapest, Hungary
Pakhomova, Nadezhda
[3
]
Pishchulov, Grigory
论文数: 0引用数: 0
h-index: 0
机构:
TU Dortmund Univ, Fac Business Econ & Social Sci, Dortmund, GermanyCorvinus Univ Budapest, Inst Business Econ, H-1093 Budapest, Hungary
Pishchulov, Grigory
[4
]
Richter, Knut
论文数: 0引用数: 0
h-index: 0
机构:
European Univ Viadrina, Fac Business Adm & Econ, Frankfurt, Oder, Germany
St Petersburg State Univ, Fac Econ, St Petersburg 199034, RussiaCorvinus Univ Budapest, Inst Business Econ, H-1093 Budapest, Hungary
Richter, Knut
[2
,3
]
机构:
[1] Corvinus Univ Budapest, Inst Business Econ, H-1093 Budapest, Hungary
[2] European Univ Viadrina, Fac Business Adm & Econ, Frankfurt, Oder, Germany
[3] St Petersburg State Univ, Fac Econ, St Petersburg 199034, Russia
[4] TU Dortmund Univ, Fac Business Econ & Social Sci, Dortmund, Germany
Joint economic lot size;
Reverse logistics;
Collection;
Remanufacturing;
EOQ;
Closed-loop supply chain;
Coordination;
Game theory;
QUANTITATIVE MODELS;
INVENTORY;
PRODUCTS;
DISCOUNTS;
D O I:
10.1007/s10100-013-0308-5
中图分类号:
C93 [管理学];
O22 [运筹学];
学科分类号:
070105 ;
12 ;
1201 ;
1202 ;
120202 ;
摘要:
We study an extended joint economic lot size problem which incorporates the return flow of remanufacturable used products. The supply chain under consideration consists of a single supplier and a single buyer. The buyer orders a single product from the supplier, uses it for her own needs, and collects the remanufacturable items after use. The ordered items are shipped from the supplier to the buyer in the lot-for-lot fashion by a vehicle which also returns the collected used items from the buyer to the supplier for remanufacturing and subsequent service of the buyer's demand in the next order cycle. For satisfying the total demand, the supplier manufactures new items or remanufactures used ones received from the buyer. For given demand, productivity, collection rate, disposal cost, setup cost, order cost, holding cost for serviceable and nonserviceable products at the supplier as well as the buyer the lot size (order size) for the supplier (buyer) has to be found which minimizes the total cost. Furthermore, we address a decentralised decision making of the parties under a two-part tariff and determine their equilibrium strategies within the Nash framework.
机构:
Chongqing Univ, Sch Econ & Business Adm, Chongqing, Peoples R ChinaChongqing Univ, Sch Econ & Business Adm, Chongqing, Peoples R China
Huang, He
Xiong, Yu
论文数: 0引用数: 0
h-index: 0
机构:
Northumbria Univ, Newcastle Business Sch, Newcastle Upon Tyne, Tyne & Wear, EnglandChongqing Univ, Sch Econ & Business Adm, Chongqing, Peoples R China
Xiong, Yu
Zhou, Yu
论文数: 0引用数: 0
h-index: 0
机构:
Chongqing Univ, Sch Econ & Business Adm, Chongqing, Peoples R ChinaChongqing Univ, Sch Econ & Business Adm, Chongqing, Peoples R China
机构:
Chongqing Univ, Sch Econ & Business Adm, Chongqing, Peoples R ChinaChongqing Univ, Sch Econ & Business Adm, Chongqing, Peoples R China
Huang, He
Xiong, Yu
论文数: 0引用数: 0
h-index: 0
机构:
Northumbria Univ, Newcastle Business Sch, Newcastle Upon Tyne, Tyne & Wear, EnglandChongqing Univ, Sch Econ & Business Adm, Chongqing, Peoples R China
Xiong, Yu
Zhou, Yu
论文数: 0引用数: 0
h-index: 0
机构:
Chongqing Univ, Sch Econ & Business Adm, Chongqing, Peoples R ChinaChongqing Univ, Sch Econ & Business Adm, Chongqing, Peoples R China