Large engineering project risk management using a Bayesian belief network

被引:196
作者
Lee, Eunchang [1 ]
Park, Yongtae [2 ]
Shin, Jong Gye [3 ]
机构
[1] Seoul Natl Univ, Grad Program Technol & Management, Seoul 151742, South Korea
[2] Seoul Natl Univ, Dept Ind Engn, Seoul 151742, South Korea
[3] Seoul Natl Univ, Dept Naval Architecture & Ocean Engn, Seoul 151742, South Korea
关键词
Risk management in large engineering projects; Shipbuilding industry; Bayesian belief network; SYSTEM;
D O I
10.1016/j.eswa.2008.07.057
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper presents a scheme for large engineering project risk management using a Bayesian belief network and applies it to the Korean shipbuilding industry. Twenty-six different risks were deduced from expert interviews and a literature review. A survey analysis was conducted on 252 experts from 11 major Korean shipbuilding companies in April 2007. The overall major risks were design change, design manpower, and raw material supply as internal risks, and exchange rate as external risk in both large-scale and medium-sized shipbuilding companies. Differences of project performance risks between large-scale and medium-sized shipbuilding companies were identified. Exceeding time schedule and specification discontent were more important to large-scale shipbuilding companies, while exceeding budget and exceeding time schedule were more important to medium-sized shipbuilding companies. The change of project performance risks was measured by risk reduction activities of quality management, and strikes at headquarters and subcontractors, in both large-scale and medium-sized shipbuilding companies. The research results should be valuable in enabling industrial participants to manage their large engineering project risks and in extending our understanding of Korean shipbuilding risks. (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:5880 / 5887
页数:8
相关论文
共 49 条
  • [1] Abellan J., 2006, Proc. 3rd Eur. Workshop Probabilistic Graphical Models, Prague, P1
  • [2] Akintoye A.S., 1997, INT J PROJ MANAG, V15, P31, DOI DOI 10.1016/S0263-7863(96)00035-X
  • [3] ALQUIER AM, 2004, IPMA INT S NORDNET 2, P83006
  • [4] Baccarini D., 2001, INT J PROJ MANAG, V19, P139, DOI DOI 10.1016/S0263-7863(99)00074-5
  • [5] Baloi D., 2003, International Journal of Project Management, V21, P261, DOI 10.1016/S0263-7863(02)00017-0
  • [6] SOFTWARE RISK MANAGEMENT - PRINCIPLES AND PRACTICES
    BOEHM, BW
    [J]. IEEE SOFTWARE, 1991, 8 (01) : 32 - 41
  • [7] BRODDA J, 2004, J SHIP PRODUCTION, V20, P100
  • [8] A fuzzy approach to construction project risk assessment and analysis: construction project risk management system
    Carr, V
    Tah, JHM
    [J]. ADVANCES IN ENGINEERING SOFTWARE, 2001, 32 (10-11) : 847 - 857
  • [9] Chapman C.B., 1997, INT J PROJ MANAG, V15, P273, DOI [DOI 10.1016/S0263-7863(96)00079-8, 10.1016/S0263-7863(96)00079-8]
  • [10] Learning Bayesian networks from data: An information-theory based approach
    Cheng, J
    Greiner, R
    Kelly, J
    Bell, D
    Liu, WR
    [J]. ARTIFICIAL INTELLIGENCE, 2002, 137 (1-2) : 43 - 90