共 53 条
[21]
Hwang C. L., 1981, Lecture Notes in Economics and Mathematical Systems, V186, P58, DOI 10.1007/978-3-642-48318-9_3
[22]
RISK ANALYSIS APPROACH TO SELECTION OF CONTRACTOR EVALUATION METHOD
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1992, 118 (04)
:814-821
[23]
Karlin S., 1966, TCHEBYCHEFF SYSTEMS
[24]
Keeney R. L, 1993, DECISIONS MULTIPLE O, DOI DOI 10.1017/CBO9781139174084
[25]
Kendall M.G., 1948, RANK CORRELATION MET
[26]
POSSIBILITIES OF CLIENTS AND CONTRACTOR'S DISPUTES SETTLEMENT AT THE PRETRIAL STAGE
[J].
TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY,
2007, 13 (02)
:139-143
[27]
Lee, 1972, GOAL PROGRAMMING DEC
[28]
Lin CT, 2007, INT J TECHNOL MANAGE, V40, P1
[29]
MILLER DW, 1969, EXECUTIVE DECISIONS, P00237
[30]
MINKOWSKY H, 1896, GEOMETRIE ZAHLEN