Simplified Cross-Entropy Based Approach for Generating Capacity Reliability Assessment

被引:31
作者
Carvalho, Leonel de Magalhaes [1 ,2 ]
Gonzalez-Fernandez, Reinaldo Andres [3 ]
Leite da Silva, Armando Martins [3 ]
da Rosa, Mauro Augusto [1 ,2 ]
Miranda, Vladimiro [1 ,2 ]
机构
[1] Inst Syst & Comp Engn Porto, INESC TEC, Oporto, Portugal
[2] Univ Porto, Fac Engn, FEUP, P-4100 Oporto, Portugal
[3] Univ Fed Itajuba, UNIFEI, Itajuba, Brazil
关键词
Cross-entropy method; generating capacity reliability; Monte Carlo simulation; reliability assessment; MONTE-CARLO-SIMULATION; ADEQUACY ASSESSMENT; SYSTEM; FREQUENCY;
D O I
10.1109/TPWRS.2012.2213618
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents a new algorithm to estimate the optimal importance sampling (IS) probability distribution in generating capacity reliability (GCR) problems. The proposed approach results from a combination of the cross-entropy (CE) concepts with the standard analytical GCR assessment. A mathematical analysis of the CE equations is carried out to demonstrate that the optimal change of measure or distortion can be obtained by simply dividing the annualized GCR indices for two different configurations of the generating system. Under these hypotheses, a straightforward algorithm based on fast Fourier transform is proposed to systematically obtain the optimal distorted unavailabilities for all generating units in the system. The accuracy and computational performance of the proposed approach are compared with the standard CE optimization process using different generating systems. The IEEE-RTS 79, IEEE-RTS 96, and two configurations of the Brazilian South-Southeastern system are all used for this purpose.
引用
收藏
页码:1609 / 1616
页数:8
相关论文
共 27 条
[1]  
[Anonymous], 1979, IEEE T POWER AP SYST, V98, P2047, DOI 10.1109/TPAS.1979.319398
[2]  
[Anonymous], Probability, Random Variables and Stochastic Processes
[3]  
Bie ZH, 2002, ELECTR POW SYST RES, V63, P59, DOI 10.1016/S0378-7796(02)00089-5
[4]   Composite system adequacy assessment using sequential Monte Carlo simulation with variance reduction techniques [J].
Billinton, R ;
Jonnavithula, A .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 1997, 144 (01) :1-6
[5]  
Billinton R, 2013, Reliability assessment of electrical power systems using Monte Carlo methods
[6]  
Billinton R., 1996, Reliability evolution of power systems, V2nd
[7]  
Christian R., 2004, SIMULATION MONTE CAR
[8]   Pseudo-chronological simulation for composite reliability analysis with time varying loads [J].
da Silva, AML ;
Manso, LAD ;
Mello, JCD ;
Billinton, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (01) :73-80
[9]   FREQUENCY AND DURATION METHOD FOR RELIABILITY EVALUATION OF LARGE-SCALE HYDROTHERMAL GENERATING SYSTEMS [J].
DASILVA, AML ;
MELO, ACG ;
CUNHA, SHF .
IEE PROCEEDINGS-C GENERATION TRANSMISSION AND DISTRIBUTION, 1991, 138 (01) :94-102
[10]   Loss of load costs in generating capacity reliability evaluation [J].
daSilva, AML ;
Perez, G ;
Lima, JWM ;
Mello, JCO .
ELECTRIC POWER SYSTEMS RESEARCH, 1997, 41 (02) :109-116