Analysis of the tunnel construction and monitoring measurement under complicated geological conditions

被引:0
|
作者
Gu, Zhanfei [1 ]
Liu, Zhikui [1 ]
Chen, Hongchi [2 ]
Wang, Yawei [3 ]
机构
[1] Guilin Univ Technol, Coll Civil Engn, Guilin 541004, Peoples R China
[2] First Construct Engn Co Ltd, China Construct Fourth Engn, Guiyang 550001, Peoples R China
[3] First Geolog Survey Henan Provincial Bur, Geo Explorat & Mineral Dev, Luoyang 471023, Peoples R China
来源
关键词
Tunnel construction; Monitoring measurement of tunnel displacement; Tunnel stability; Complicated geological conditions;
D O I
10.4028/www.scientific.net/AMM.90-93.2091
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In view of certain areas of Guizhou are soft sandstone rock, where single block of rock's hardness is very low and easily crushed, complicated hydrogeology and low level of complex surrounding rock and geological conditions, geological radar prediction is used before the excavation of the tunnel, and New Austrian Tunneling Method was used in the construction. The process of construction segment had been monitored and measured, and the deformation of tunnel had been controlled. According to the situation during excavation and monitoring, the construction method was further improved. Through tracing and monitoring the tunnel construction of from zk40+430 to zk40+630 sections for two months, showed that the tunnel construction method is effective in this paper.
引用
收藏
页码:2091 / +
页数:2
相关论文
共 50 条
  • [1] The deformation characteristics analysis of metro tunnel in complicated geological conditions
    Qiu Dao Hong
    Li Shu Cai
    Xue Yi Guo
    Xie Fu Dong
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 1297 - 1300
  • [2] Intrinsically safe in the tunnel construction under complex geological conditions
    Liu, Hui
    Xie, Zhen
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 1327 - 1330
  • [3] Excavation and Construction Technology of Diversion Tunnel under Complex Geological Conditions
    He, Na
    Zhang, Xianggang
    APPLIED SCIENCES-BASEL, 2023, 13 (20):
  • [4] Displacement measurement and stability analysis of wall rock in cave depot excavation under complicated geological conditions
    Dai Youbin
    Peng Chunfin
    Ding Xiaoqiu
    Zang Wengang
    ISTM/2007: 7TH INTERNATIONAL SYMPOSIUM ON TEST AND MEASUREMENT, VOLS 1-7, CONFERENCE PROCEEDINGS, 2007, : 3703 - 3706
  • [5] Mechanical Properties of Universal Segmented Tunnel under Different Geological Conditions during Construction
    Zhang, K. P.
    Ma, W. J.
    Jin, Y. Y.
    Xu, P. B.
    ICRT 2021: PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON RAIL TRANSPORTATION, 2022, : 313 - 320
  • [6] Current status of and suggestion on monitoring and measurement and advance geological prediction technology for highway tunnel construction
    Lei, J. (ljq_262127@126.com), 1600, China Railway Southwest Research Institute Co. Ltd., No.97 Gunan Street, West Hi-Tech Zone, Chengdu, 611731, China (50):
  • [7] Analysis of stress and deformation site-monitoring in fault zone of Wushaoling tunnel under complex geological conditions
    Lei Jun
    Zhang Jin-zhu
    Lin Chuan-nian
    ROCK AND SOIL MECHANICS, 2008, 29 (05) : 1367 - 1371
  • [8] Analysis of stress and deformation site-monitoring in fault zone of Wushaoling tunnel under complex geological conditions
    Lei, Jun
    Zhang, Jin-Zhu
    Lin, Chuan-Nian
    Yantu Lixue/Rock and Soil Mechanics, 2008, 29 (05): : 1367 - 1371
  • [9] Key Construction Technology of Ultra-deep Diaphragm Wall Under Complicated Geological Conditions
    SHI Jiangchuan
    LIU Weiwei
    CHENG Peichun
    NIE Yanxia
    ZHU Haobo
    XIE Zhicheng
    施工技术(中英文), 2022, 51 (09) : 106 - 113
  • [10] Construction Technology of Super-deep Diaphragm Wall under Complicated Geological and Hydraulic Conditions
    Yang, Baozhu
    Zhang, Shuchao
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 1247 - +