Research on Distortion Field of Inspection Robot around 500kV Substation Transformer

被引:1
|
作者
Li, Yongming [1 ]
He, Shengyu [1 ]
Wang, Xuxu [2 ]
Wang, Xiaowan [1 ]
Guo, Changyong [1 ]
Zou, Anxin [3 ]
Xu, Luwen [3 ]
机构
[1] Chongqing Univ, State Key Lab Power Transmiss Equipment & Syst Se, Chongqing, Peoples R China
[2] Zhejiang Elect Power Co Ltd, Shaoxing Power Supply Co, Shaoxing, Zhejiang, Peoples R China
[3] Chongqing Elect Power Test & Res Inst, Chongqing, Peoples R China
关键词
Inspection robot; electromagnetic field; Substation; Finite Element Method; Charge Simulation Method; Transformer;
D O I
10.1109/CIEEC47146.2019.CIEEC-2019432
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Artificial intelligence technology has developed rapidly, and inspection robots have been increasingly applied to the inspection work of substations. The electromagnetic environment of the substation is complex, and whether the inspection robot can work normally in a complex electromagnetic environment is a problem worthy of attention. Therefore, this paper establishes an inspection robot model to explore the electric field distribution of the inspection robot during substation operation. The Charge Simulation Method is suitable for the calculation of open domain, and the Finite Element Method is suitable fir the calculation of complex boundary problems. Combining the advantages of the two, this paper uses the mixed calculation of Finite Element Method and Charge Simulation method to analyze the electric field distribution around the inspection robot when it's working. The results of computation show that the electric field around each device is distorted, and the electric field distortion around the top device is the most serious.
引用
收藏
页码:1174 / 1179
页数:6
相关论文
共 50 条
  • [31] Numerical Analysis of Transient Stray Field and Performance Parameters For 500kV Converter Transformer
    Wang, Jianmin
    Zhang, Xile
    Wang, Yongqing
    Cheng, Zhiguang
    Zhao, Xiush
    Liu, Lanr
    Fan, Yana
    2008 WORLD AUTOMATION CONGRESS PROCEEDINGS, VOLS 1-3, 2008, : 1503 - +
  • [32] Simulation of transformer PD pulse propagation and monitoring for a 500 kV substation
    Dong, XZ
    Zhu, DH
    Wang, CC
    Tan, KX
    Liu, YL
    IEEE TRANSACTIONS ON DIELECTRICS AND ELECTRICAL INSULATION, 1999, 6 (06) : 803 - 813
  • [33] Design and Test of the Insulator Detection Robot in 500kV
    Liang, Jian
    Zhang, Feng
    Zhong, Liang
    Guo, Rui
    Yang, Bo
    Zhou, Dazhou
    Jia, Juan
    2019 6TH INTERNATIONAL CONFERENCE ON INFORMATION SCIENCE AND CONTROL ENGINEERING (ICISCE 2019), 2019, : 246 - 249
  • [34] Simulation Analysis of Magnetizing Inrush Current of 500kV Transformer
    Zhu, Shengyi
    Wang, Tongtong
    Jin, Haiqiang
    Wen, Jun
    2020 6TH INTERNATIONAL CONFERENCE ON ELECTRICAL ENGINEERING, CONTROL AND ROBOTICS (EECR 2020), 2020, 853
  • [35] Analysis of 500kV Capacitive Voltage Transformer Leakage Fault
    Yu Bing
    Zhao Lin
    Lin Haofan
    Zhou Luyao
    Yang Zhi
    Liu Shuang
    2021 THE 6TH INTERNATIONAL CONFERENCE ON INTEGRATED CIRCUITS AND MICROSYSTEMS (ICICM 2021), 2021, : 403 - 407
  • [36] Study on Operating Overvoltage for 500kV Huadu Substation Based on the Statistical Switch
    Wang, Tong
    Li, Yi
    Zeng, Yanjun
    Fan, Youping
    2015 2ND ASIAN PACIFIC CONFERENCE ON ENERGY, ENVIRONMENT AND SUSTAINABLE DEVELOPMENT (APEESD 2015), 2015, : 480 - 484
  • [37] The Application of Sites Selection Based on AHP-SVM in 500KV Substation
    Yang, Yi
    Du, Qiushi
    Zhao, Jinying
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, : 1225 - +
  • [38] THE 4X6 NETWORK - UPGRADE OF A MAJOR 500KV SUBSTATION
    PAGE, R
    NISHIKAWARA, K
    STROMOTICH, F
    IEEE TRANSACTIONS ON POWER DELIVERY, 1991, 6 (02) : 626 - 632
  • [39] Development of an inspection robot control system for 500KV extra-high voltage power transmission lines
    Tang, L
    Fang, LJ
    Wang, HG
    SICE 2004 ANNUAL CONFERENCE, VOLS 1-3, 2004, : 1819 - 1824
  • [40] Safe Distance of Inspection Operation by Unmanned Aerial Vehicles in 500 kV Substation
    Cai, Huanqing
    Fu, Jing
    Yang, Ning
    Shao, Guiwei
    Wen, Zhike
    Tan, Jiaying
    Gaodianya Jishu/High Voltage Engineering, 2024, 50 (07): : 3199 - 3208