Research on Distortion Field of Inspection Robot around 500kV Substation Transformer

被引:1
|
作者
Li, Yongming [1 ]
He, Shengyu [1 ]
Wang, Xuxu [2 ]
Wang, Xiaowan [1 ]
Guo, Changyong [1 ]
Zou, Anxin [3 ]
Xu, Luwen [3 ]
机构
[1] Chongqing Univ, State Key Lab Power Transmiss Equipment & Syst Se, Chongqing, Peoples R China
[2] Zhejiang Elect Power Co Ltd, Shaoxing Power Supply Co, Shaoxing, Zhejiang, Peoples R China
[3] Chongqing Elect Power Test & Res Inst, Chongqing, Peoples R China
来源
PROCEEDINGS OF 2019 IEEE 3RD INTERNATIONAL ELECTRICAL AND ENERGY CONFERENCE (CIEEC) | 2019年
关键词
Inspection robot; electromagnetic field; Substation; Finite Element Method; Charge Simulation Method; Transformer;
D O I
10.1109/CIEEC47146.2019.CIEEC-2019432
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Artificial intelligence technology has developed rapidly, and inspection robots have been increasingly applied to the inspection work of substations. The electromagnetic environment of the substation is complex, and whether the inspection robot can work normally in a complex electromagnetic environment is a problem worthy of attention. Therefore, this paper establishes an inspection robot model to explore the electric field distribution of the inspection robot during substation operation. The Charge Simulation Method is suitable for the calculation of open domain, and the Finite Element Method is suitable fir the calculation of complex boundary problems. Combining the advantages of the two, this paper uses the mixed calculation of Finite Element Method and Charge Simulation method to analyze the electric field distribution around the inspection robot when it's working. The results of computation show that the electric field around each device is distorted, and the electric field distortion around the top device is the most serious.
引用
收藏
页码:1174 / 1179
页数:6
相关论文
共 25 条
  • [21] Voltage and Electric Field Distribution along Porcelain Long Rod Insulator String in AC 500kV Transmission Line
    Zhang, Baiqing
    Cui, Yandong
    Zhang, Wei
    Liu, Siyi
    Zheng, Qiuwei
    Yang, Shuai
    Gao, Song
    2016 IEEE INTERNATIONAL CONFERENCE ON HIGH VOLTAGE ENGINEERING AND APPLICATION (ICHVE), 2016,
  • [22] Research on Autonomous Negotiation Action Planning for 110kV Power Transmission Line Inspection Robot
    Zhou, Fengyu
    Li, Yibin
    Li, Caihong
    Li, Feng
    Wang, Changxun
    Chen, Wenwen
    2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 7455 - +
  • [23] The analysis of Body Surface Electric Field during Live Working on 500kV double-circuit lines on same tower
    Liu, Xiaqin
    Yang, Qi
    Li, Hui
    Chen, Jianping
    Li, Jinliang
    Xu, Li
    2016 IEEE INTERNATIONAL CONFERENCE ON HIGH VOLTAGE ENGINEERING AND APPLICATION (ICHVE), 2016,
  • [24] Generator voltage building-up field test for 500 kV transformer energization for black-start power system
    Kyushu Electric Power Company Inc., 2-1-47, Shiobaru, Minami-ku, Fukuoka 815-8520, Japan
    不详
    IEEJ Trans. Power Energy, 2008, 4 (641-646+3): : 641 - 646+3
  • [25] Simulation Research on Reactive Power Loss Characteristic of 500 kV Transformer under Late-Time High-Altitude Electromagnetic Pulses
    Yang Y.
    Liu M.
    Xie Y.
    Chen Y.
    Tian S.
    Diangong Jishu Xuebao/Transactions of China Electrotechnical Society, 2024, 39 (01): : 267 - 277