Automating closed-loop structural safety management for bridge construction through multisource data integration

被引:27
作者
Lin Jia-Rui [1 ]
Zhang Jian-Ping [1 ]
Zhang Xiao-Yang [1 ]
Hu Zhen-Zhong [1 ,2 ]
机构
[1] Tsinghua Univ, Dept Civil Engn, Beijing 100084, Peoples R China
[2] Tsinghua Univ, Grad Sch Shenzhen, Shenzhen 518055, Peoples R China
基金
国家重点研发计划; 中国国家自然科学基金; 中国博士后科学基金;
关键词
Structural safety; Closed-loop management; Information modeling; Data integration; Time-dependent structure; VISUALIZATION TECHNOLOGY; 4D CAD; DESIGN; MODELS; FRAMEWORK; SYSTEM;
D O I
10.1016/j.advengsoft.2018.11.013
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Structural safety during construction is vital to engineering success of large scale bridges. However, difficulties in time-dependent structural modeling and data fragmentation of different engineering and management systems remain unresolved, hindering the plan, do, check, and adjust (PDCA) loop for structural safety management during bridge construction. In this paper, an integrated framework for closed-loop management of structural safety based on multisource data integration is presented. The proposed framework consists of a bridge safety information model (BrSIM), algorithms for data integration and semi-automatic time-dependent structural model generation, and methods for structural safety warning and assessment. The proposed BrSIM and algorithms integrate data related to 3D products, schedule, structural simulation and monitoring from various engineering systems, which covers the main data for structural safety management during construction. Meanwhile, automatic calculation and generation of static loads and constraints of a structural model based on 3D product information and monitoring data are also considered. Demonstration in the construction of a long-span bridge shows that with the proposed framework, it is possible to visualize the construction process, generate time-dependent structural models and simulate, monitor and assess the structural safety dynamically. Thus, the structural safety management loop is automated and fully closed. Furthermore, by tracking and simulating the changes of structural performance over time, and comparing the difference between simulation results and monitoring data, earlier detection and better evaluation of potential structural risks are achieved. Moreover, efficiency of information modeling and sharing is improved and effective management and decision-making are achieved with the proposed approach.
引用
收藏
页码:152 / 168
页数:17
相关论文
共 52 条
[41]  
Tsai M, 2009, WORKFLOW REENGINEERI
[42]   MEDIATORS IN THE ARCHITECTURE OF FUTURE INFORMATION-SYSTEMS [J].
WIEDERHOLD, G .
COMPUTER, 1992, 25 (03) :38-49
[43]  
Xia Y, 2011, STRESS DEV SUPERTALL, P542
[44]   BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies [J].
Zhang, J. P. ;
Hu, Z. Z. .
AUTOMATION IN CONSTRUCTION, 2011, 20 (02) :155-166
[45]  
Zhang S, 2012, P CONSTR RES C 2012
[46]   Workforce location tracking to model, visualize and analyze workspace requirements in building information models for construction safety planning [J].
Zhang, Sijie ;
Teizer, Jochen ;
Pradhananga, Nipesh ;
Eastman, Charles M. .
AUTOMATION IN CONSTRUCTION, 2015, 60 :74-86
[47]   Building Information Modeling (BIM) and Safety: Automatic Safety Checking of Construction Models and Schedules [J].
Zhang, Sijie ;
Teizer, Jochen ;
Lee, Jin-Kook ;
Eastman, Charles M. ;
Venugopal, Manu .
AUTOMATION IN CONSTRUCTION, 2013, 29 :183-195
[48]   Application of 4D visualization technology for safety management in metro construction [J].
Zhou, Y. ;
Ding, L. Y. ;
Chen, L. J. .
AUTOMATION IN CONSTRUCTION, 2013, 34 :25-36
[49]  
Zhou Y, 2010, P INT C ADV MECH ENG
[50]   Overview and analysis of safety management studies in the construction industry [J].
Zhou, Zhipeng ;
Goh, Yang Miang ;
Li, Qiming .
SAFETY SCIENCE, 2015, 72 :337-350