Automating closed-loop structural safety management for bridge construction through multisource data integration

被引:27
作者
Lin Jia-Rui [1 ]
Zhang Jian-Ping [1 ]
Zhang Xiao-Yang [1 ]
Hu Zhen-Zhong [1 ,2 ]
机构
[1] Tsinghua Univ, Dept Civil Engn, Beijing 100084, Peoples R China
[2] Tsinghua Univ, Grad Sch Shenzhen, Shenzhen 518055, Peoples R China
基金
国家重点研发计划; 中国国家自然科学基金; 中国博士后科学基金;
关键词
Structural safety; Closed-loop management; Information modeling; Data integration; Time-dependent structure; VISUALIZATION TECHNOLOGY; 4D CAD; DESIGN; MODELS; FRAMEWORK; SYSTEM;
D O I
10.1016/j.advengsoft.2018.11.013
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Structural safety during construction is vital to engineering success of large scale bridges. However, difficulties in time-dependent structural modeling and data fragmentation of different engineering and management systems remain unresolved, hindering the plan, do, check, and adjust (PDCA) loop for structural safety management during bridge construction. In this paper, an integrated framework for closed-loop management of structural safety based on multisource data integration is presented. The proposed framework consists of a bridge safety information model (BrSIM), algorithms for data integration and semi-automatic time-dependent structural model generation, and methods for structural safety warning and assessment. The proposed BrSIM and algorithms integrate data related to 3D products, schedule, structural simulation and monitoring from various engineering systems, which covers the main data for structural safety management during construction. Meanwhile, automatic calculation and generation of static loads and constraints of a structural model based on 3D product information and monitoring data are also considered. Demonstration in the construction of a long-span bridge shows that with the proposed framework, it is possible to visualize the construction process, generate time-dependent structural models and simulate, monitor and assess the structural safety dynamically. Thus, the structural safety management loop is automated and fully closed. Furthermore, by tracking and simulating the changes of structural performance over time, and comparing the difference between simulation results and monitoring data, earlier detection and better evaluation of potential structural risks are achieved. Moreover, efficiency of information modeling and sharing is improved and effective management and decision-making are achieved with the proposed approach.
引用
收藏
页码:152 / 168
页数:17
相关论文
共 52 条
[21]  
Kiviniemi M, 2011, VTT RES NOTES, V2597, P1
[22]   Feasibility study of 4D CAD in commercial construction [J].
Koo, B ;
Fischer, M .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (04) :251-260
[23]   A Project-based Quantification of BIM Benefits [J].
Li, Jian ;
Hou, Lei ;
Wang, Xiangyu ;
Wang, Jun ;
Guo, Jun ;
Zhang, Shaohua ;
Jiao, Yi .
INTERNATIONAL JOURNAL OF ADVANCED ROBOTIC SYSTEMS, 2014, 11
[24]  
Lin J, 2015, P 15 INT C CONSTR AP
[25]   Online monitoring of highway bridge construction using fiber Bragg grating sensors [J].
Lin, YB ;
Pan, CL ;
Kuo, YH ;
Chang, KC ;
Chern, JC .
SMART MATERIALS AND STRUCTURES, 2005, 14 (05) :1075-1082
[26]  
Liu Y, 2013, RES VIRTUAL CONSTRUC
[27]   Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization [J].
Lu, Ming ;
Lam, Hoi-Ching ;
Dai, Fei .
AUTOMATION IN CONSTRUCTION, 2008, 17 (06) :670-681
[28]  
Lynch J. P., 2006, Shock and Vibration Digest, V38, P91, DOI 10.1177/0583102406061499
[29]  
Marzouk M., 2010, Proceedings of the 27th International Conference - Applications of IT in the AEC Industry (CIB W78), P1
[30]   Dynamic and multi perspective risk management in construction with a special view to temporary structures [J].
Mehdizadeh, Rasool ;
Breysse, Denys ;
Taillandier, Franck ;
Niandou, Halidou .
CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS, 2013, 30 (02) :115-129