Middle route of South-to-North Water Transfer Project in Beijing section of operation risk identification research

被引:0
作者
Bo, Fan [1 ]
Ye, Wang
Jun, Huang [1 ]
机构
[1] Chinese Acad Sci, Grad Univ, Coll Engn, Beijing, Peoples R China
来源
PROCEEDINGS OF INTERNATIONAL SYMPOSIUM ON EMERGENCY MANAGEMENT 2011 | 2012年
关键词
the South-North Water Transfer Project in section of Beijing; Operation period; System decomposition; Failure mode analysis; Risk identification;
D O I
暂无
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
In this paper, preliminary built and put into operation in the middle route of South-to-North Water Transfer Project in Beijing section as an example, the use of project risk management theory, through the risk identification method after comparison and analysis, put forward the risk stage identification method. In the use of expert investigation, Delphi method to the risk identification, the system is decomposed into several subsystems, using failure mode effect analysis principle, further identify the system failure mode, failure, failure parts, so that each subsystem risk factors, and finally summarized the Mid-route of South-to-North Water Transfer Project of Beijing section engineering risk recognition framework.
引用
收藏
页码:170 / 173
页数:4