共 67 条
- [32] Grimsey D., 2002, Int. J. Proj. Manag., V20, P107, DOI [DOI 10.1016/S0263-7863(00)00040-5, 10.1016/S0263-7863(00)00040-5]
- [33] Risk allocation in lump-sum contracts - Concept of latent dispute [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (03): : 291 - 296
- [38] Multiobjective Optimization of Resource Leveling and Allocation during Construction Scheduling [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (12): : 1080 - 1088
- [39] Kalidindi S. N., 2006, International Journal of Project Management, V24, P605, DOI 10.1016/j.ijproman.2006.07.008
- [40] RISK MANAGEMENT PERCEPTIONS AND TRENDS OF US CONSTRUCTION [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (04): : 422 - 429