Combined discrete-event/continuous simulation for project planning

被引:37
作者
AbouRizk, SM
Wales, RJ
机构
[1] Dept. of Civ. Engrg., Univ. of Alberta, Edmonton
[2] North American Construction Group, Edmonton, Alta. T5M 2S4
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 1997年 / 123卷 / 01期
关键词
D O I
10.1061/(ASCE)0733-9364(1997)123:1(11)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper focuses on the application of ''combined simulation modeling'' to achieve more accurate and flexible modeling of random processes affecting construction progress. In particular, a model is presented where a project schedule prepared using the critical path method (CPM) is transferred into a process interaction-discrete event simulation model and then combined with a continuous change weather process in the same model. The combined approach provides certain advantages to other methods. It is more effective than deterministically adding the expected delay due to weather to the expected duration of the project estimated from CPM, for example. It is also more accurate than using straight Monte Carlo-simulation of the CPM schedule or discrete event simulation modeling. The paper also provides an overview of the various aspects of implementing the combined model including use of mathematical and statistical methods to model weather processes and trained neural networks to estimate the effects of weather on productivity.
引用
收藏
页码:11 / 20
页数:10
相关论文
共 25 条
  • [1] ABOURIZK S, 1993, P 5 INT C COMP CIV E, P1990
  • [2] ABOURIZK SM, 1992, P 1992 WINT SIM C, P1271
  • [3] SIMULATION-MODEL TO FORECAST PROJECT COMPLETION-TIME
    AHUJA, HN
    NANDAKUMAR, V
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1985, 111 (04): : 325 - 342
  • [4] [Anonymous], 1999, APPL OCCUP ENVIRON H, DOI DOI 10.1080/104732299303296
  • [5] *ATM ENV SERV, 1991, MONTH REC 199
  • [6] CARR RI, 1979, J CONSTR DIV ASCE, V105, P115
  • [7] DABBAS MA, 1983, J CONSTR ENG M ASCE, V108, P361
  • [8] NEURAL NETWORKS IN CIVIL ENGINEERING .1. PRINCIPLES AND UNDERSTANDING
    FLOOD, I
    KARTAM, N
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1994, 8 (02) : 131 - 148
  • [9] Katz RW, 1985, PROBABILITY STAT DEC, P261
  • [10] KAVVAS ML, 1977, P S MOD HYDR PROC, P44