Maintenance schedule optimisation for a railway power supply system

被引:22
作者
Chen, Shaokuan [1 ]
Ho, Tinkin [2 ]
Mao, Baohua [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Traff & Transportat, Integrated Transport Res Ctr China, Beijing, Peoples R China
[2] Univ Wollongong, SMART Infrastruct Facil, Wollongong, NSW, Australia
基金
中国国家自然科学基金;
关键词
railway power supply system; maintenance schedule; optimisation; PREVENTIVE MAINTENANCE; GENETIC ALGORITHM; TABU SEARCH; MECHANICAL COMPONENTS; MODEL; AVAILABILITY; RELIABILITY; METHODOLOGY; TRACTION; POLICIES;
D O I
10.1080/00207543.2013.774501
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
High reliability is the crucial requirement in railway operation and a power supply system is one of the key components of electrified railways. The cost-effectiveness of the maintenance works is also the concern of the railway operators while the time window on trackside maintenance is often limited. Maintenance scheduling is thus essential to uphold reliability and to reduce operation cost. It is however difficult to formulate the optimal schedule to meet both reliability and maintenance cost for a railway power supply system as a whole because of its functional complexity and demanding operation conditions. Maintenance scheduling models to achieve reliability and maintenance cost are proposed in this study. Optimisation algorithms are then developed to attain the solutions of the model. The applicability of the models and efficiency of the solution algorithms are demonstrated in an example. The proposed methods are vitally important for the railway engineers and operators to assure the service quality in the increasing demands of the modern electrified railways.
引用
收藏
页码:4896 / 4910
页数:15
相关论文
共 55 条
[1]   Linear convergence of a modified Frank-Wolfe algorithm for computing minimum-volume enclosing ellipsoids [J].
Ahipasaoglu, S. Damla ;
Sun, Peng ;
Todd, Michael J. .
OPTIMIZATION METHODS & SOFTWARE, 2008, 23 (01) :5-19
[2]  
[Anonymous], 2003, Handbook of Reliability Engineering
[4]   Reliability-based optimization of maintenance scheduling of mechanical components under fatigue [J].
Beaurepaire, P. ;
Valdebenito, M. A. ;
Schueller, G. I. ;
Jensen, H. A. .
COMPUTER METHODS IN APPLIED MECHANICS AND ENGINEERING, 2012, 221 :24-40
[5]   Simultaneous scheduling of production and maintenance tasks in the job shop [J].
Ben Ali, M. ;
Sassi, M. ;
Gossa, M. ;
Harrath, Y. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (13) :3891-3918
[6]   Maintenance scheduling of a protection system subject to imperfect inspection and replacement [J].
Berrade, M. D. ;
Cavalcante, Cristiano A. V. ;
Scarf, Philip A. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 218 (03) :716-725
[7]   Optimal maintenance scheduling in a parallel redundant system consisting of series components in each branch [J].
Billinton, R ;
Pan, J .
IEEE TRANSACTIONS ON POWER DELIVERY, 1999, 14 (03) :928-933
[8]   A bi-objective model to optimize reliability and cost of system with a choice of redundancy strategies [J].
Chambari, Amirhossain ;
Rahmati, Seyed Habib A. ;
Najafi, Amir Abbas ;
Karimi, Aida .
COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 63 (01) :109-119
[9]   A practical maintenance scheduling program: Mathematical model and case study [J].
Chattopadhyay, D .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1998, 13 (04) :1475-1480
[10]  
Chelouah R., 2000, EUR J OPER RES, V161, P636