Comparative evaluation of different offshore wind turbine installation vessels for Korean west-south wind farm

被引:81
作者
Ahn, Dang [1 ]
Shin, Sung-Chul [1 ]
Kim, Soo-young [1 ]
Kharoufi, Hicham [1 ]
Kim, Hyun-cheol [2 ]
机构
[1] Pusan Natl Univ, Dept Naval Architecture & Ocean Engn, Busan, South Korea
[2] Ulsan Coll, Dept Mech Engn, Ulsan, South Korea
关键词
Offshore wind turbine installation; West-south wind farm; Installation cost; WTIV; Jack-up barge;
D O I
10.1016/j.ijnaoe.2016.07.004
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
The purpose of this study is to evaluate various means of wind power turbines installation in the Korean west south wind farm (Test bed 100 MW, Demonstrate site 400 MW). We presented the marine environment of the southwest offshore wind farm in order to decide the appropriate installation vessel to be used in this site. The various vessels would be WTIV (Wind turbine installation vessel), jack-up barge, or floating crane... etc. We analyzed the installation cost of offshore wind turbine and the transportation duration for each vessel. The analysis results showed the most suitable installation means for offshore wind turbine in the Korean west south wind farm. Copyright (C) 2016 Society of Naval Architects of Korea. Production and hosting by Elsevier B.V.
引用
收藏
页码:45 / 54
页数:10
相关论文
共 5 条
[1]  
[Anonymous], THESIS
[2]  
Emre U., 2011, THESIS
[3]  
Herman S. A., 2002, ECNI02002
[4]  
Kaiser M.J., 2012, Offshore Wind Energy Cost Modeling: Installation and Decommissioning
[5]  
Thomsen KE, 2012, OFFSHORE WIND: A COMPREHENSIVE GUIDE TO SUCCESSFUL OFFSHORE WIND FARM INSTALLATION, P1