Fuzzy Approaches and Simulation-Based Reliability Modeling to Solve a Road-Rail Intermodal Routing Problem with Soft Delivery Time Windows When Demand and Capacity are Uncertain

被引:41
作者
Sun, Yan [1 ]
机构
[1] Shandong Univ Finance & Econ, Sch Management Sci & Engn, 7366 Second Ring East Rd, Jinan 250014, Shandong, Peoples R China
关键词
Road-rail intermodal routing; Demand uncertainty; Capacity uncertainty; Soft time windows; Simulation-based reliability; Fuzzy programming model; Fuzzy expected value; Fuzzy chance-constrained programming; Fuzzy ranking; LOOP SUPPLY CHAIN; MATHEMATICAL-PROGRAMMING TECHNIQUES; MULTIMODAL TRANSPORTATION PROBLEM; PROCESS SYSTEMS; NETWORK; DESIGN; OPTIMIZATION; FREIGHT; LOCATION;
D O I
10.1007/s40815-020-00905-x
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this study, a freight routing problem considering both soft delivery time windows and demand and capacity uncertainty in a road-rail intermodal transportation system is investigated. According to fuzzy set theory, uncertain demands and capacities are formulated as trapezoidal fuzzy numbers. Soft delivery time windows under a fuzzy environment is established, in which fuzzy periods caused by early and late deliveries that lead to penalty are modeled based on maximum functions. To solve the routing problem yielding the above characteristics, this study designs a fuzzy mixed-integer nonlinear programming model whose objective is to minimize the total costs created in the road-rail intermodal transportation activities. After using the fuzzy expected value method to address the fuzzy objective, two fuzzy approaches, i.e., fuzzy chance-constrained programming method and fuzzy ranking method, are separately adopted to undertake the defuzzification of the fuzzy constraints. Improved linear formulations of the model are then produced to make it easier to solve. A simulation-based reliability modeling is developed to quantify the reliability of the optimization results given by different fuzzy approaches under different parameter settings in a simulation environment. Finally, an empirical case is presented to verify the feasibility of the proposed methods. The effects of demand and capacity fuzziness on the routing optimization are revealed, and an optimization procedure that helps decision-makers to select a more suitable fuzzy approach and determine the best parameter setting for a given case is demonstrated. Some insights that are helpful for organizing a reliable transportation are also drawn.
引用
收藏
页码:2119 / 2148
页数:30
相关论文
共 69 条
[1]   An intermodal multicommodity routing problem with scheduled services [J].
Ayar, Burak ;
Yaman, Hande .
COMPUTATIONAL OPTIMIZATION AND APPLICATIONS, 2012, 53 (01) :131-153
[2]  
Barnhart C., 1993, Journal of Business Logistics, V14, P205
[3]  
Bast H, 2016, LECT NOTES COMPUT SC, V9220, P19, DOI 10.1007/978-3-319-49487-6_2
[4]   A review of fleet planning problems in single and multimodal transportation systems [J].
Baykasoglu, Adil ;
Subulan, Kemal ;
Tasan, A. Serdar ;
Dudakli, Nurhan .
TRANSPORTMETRICA A-TRANSPORT SCIENCE, 2019, 15 (02) :631-697
[5]  
Bierwirth C., 2012, BuR-Business Research, V5, P198, DOI 10.1007/BF03342738
[6]   Computer assisted routing of intermodal shipments [J].
Boardman, BS ;
Malstrom, EM ;
Butler, DP ;
Cole, MH .
COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (1-2) :311-314
[7]   Is a new applied transportation research field emerging? - A review of intermodal rail-truck freight transport literature [J].
Bontekoning, YM ;
Macharis, C ;
Trip, JJ .
TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2004, 38 (01) :1-34
[8]   Intermodal routing of Canada-Mexico shipments under NAFTA [J].
Bookbinder, JH ;
Fox, NS .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 1998, 34 (04) :289-303
[9]   Decision support in intermodal transport: A new research agenda [J].
Caris, An ;
Macharis, Cathy ;
Janssens, Gerrit K. .
COMPUTERS IN INDUSTRY, 2013, 64 (02) :105-112
[10]  
Castillo O., INT J FUZZY SYSTEMS