Special issue on Integrated optimization models and algorithms in It rail planning and control

被引:19
作者
Meng, Lingyun [1 ]
Corman, Francesco [2 ]
Zhou, Xuesong [3 ]
Tang, Tao [4 ]
机构
[1] Beijing Jiaotong Univ, Sch Traff & Transportat, 3 ShangYuanCun, Beijing 100044, Peoples R China
[2] ETH Transport Syst, IVT, Stefano Franscini Pl 5, CH-8093 Zurich, Switzerland
[3] Arizona State Univ, Sch Sustainable Engn & Built Environm, Tempe, AZ 85287 USA
[4] Beijing Jiaotong Univ, State Key Lab Rail Traff Control & Safety, 3 ShangYuanCun, Beijing 100044, Peoples R China
关键词
LINE; SYSTEMS; MAINTENANCE; TIMETABLES; MANAGEMENT; SCHEDULES; SERVICES; DESIGN;
D O I
10.1016/j.trc.2018.01.003
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
引用
收藏
页码:87 / 90
页数:4
相关论文
共 27 条
[1]   Rescheduling through stop-skipping in dense railway systems [J].
Altazin, Estelle ;
Dauzere-Peres, Stephane ;
Ramond, Francois ;
Trefond, Sabine .
TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2017, 79 :73-84
[2]   The multi-objective railway timetable rescheduling problem [J].
Binder, Stefan ;
Maknoon, Yousef ;
Bierlaire, Michel .
TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2017, 78 :78-94
[3]   Recent success stories on integrated optimization of railway systems [J].
Borndoerfer, Ralf ;
Klug, Torsten ;
Lamorgese, Leonardo ;
Mannino, Carlo ;
Reuther, Markus ;
Schlechte, Thomas .
TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2017, 74 :196-211
[4]   Integrating robust timetabling in line plan optimization for railway systems [J].
Burggraeve, Sofie ;
Bull, Simon Henry ;
Vansteenwegen, Pieter ;
Lusby, Richard Martin .
TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2017, 77 :134-160
[5]   An overview of recovery models and algorithms for real-time railway rescheduling [J].
Cacchiani, Valentina ;
Huisman, Dennis ;
Kidd, Martin ;
Kroon, Leo ;
Toth, Paolo ;
Veelenturf, Lucas ;
Wagenaar, Joris .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2014, 63 :15-37
[6]   A Review of Online Dynamic Models and Algorithms for Railway Traffic Management [J].
Corman, Francesco ;
Meng, Lingyun .
IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2015, 16 (03) :1274-1284
[7]   Real-time automatic rescheduling strategy for an urban rail line by integrating the information of fault handling [J].
Gao, Yuan ;
Yang, Lixing ;
Gao, Ziyou .
TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2017, 81 :246-267
[8]  
Hansen Ingo., 2014, Railway timetabling and operations: Analysis, modelling, optimisation, simulation, performance, evaluation
[9]   Optimization of periodic crew schedules with application of column generation method [J].
Janacek, Jaroslav ;
Kohani, Michal ;
Koniorczyk, Matyas ;
Marton, Peter .
TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2017, 83 :165-178
[10]   A delay root cause discovery and timetable adjustment model for enhancing the punctuality of railway services [J].
Lee, Wei-Hsun ;
Yen, Li-Hsien ;
Chou, Chien-Ming .
TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2016, 73 :49-64