Multi-product capacitated disassembly lot-sizing problem with lost sales and possibility of defective disassembly components

被引:1
作者
Hrouga, M. [1 ]
Sbihi, A. [1 ]
机构
[1] Brest Business Sch, 2 Ave Provence, Brest, France
关键词
Lot-sizing; Planning; Defective Items; Lost sales; Reverse Logistics; HEURISTICS; MODEL;
D O I
10.1016/j.ifacol.2022.09.446
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
One of the major disassembly problems is the number of defective disassembly components and uncertain return of end-of-life (EoL) products to be recovered from end user. In fact, if many disassembled components are defective or the quantity of EoL products to be recovered is inadequate, customer demand cannot be satisfied, and this generates lost sales. This paper addresses the multi-product capacitated disassembly lot-sizing problem with lost sales and possibility of defective disassembled items or components. The objective aims at determining the quantity of the EoL products to be disassembled in each period to minimize the total cost or maximize total profit earned by resale of the component recovered by disassembly operations. Hence, to maximize this total profit, a new mixed-integer linear programming (MILP) approach allowing lost sales is firstly proposed. Secondly, three properties that can be used to determine the optimal solution are studied. Finally, the proposed model is solved using well-known CPLEX solver to both show the model performances and verify the limit of exact method. Test results showed that CPLEX was unable to solve all instances in reasonable computational time and an optimization approach method such as heuristic or meta-heuristic will be crucial to solve the large instances. Copyright (C) 2022 The Authors.
引用
收藏
页码:520 / 525
页数:6
相关论文
共 22 条
[1]   Heuristics for the multi-item capacitated lot-sizing problem with lost sales [J].
Absi, Nabil ;
Detienne, Boris ;
Dauzere-Peres, Stephane .
COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (01) :264-272
[2]   Uncapacitated lot-sizing problem with production time windows, early productions, backlogs and lost sales [J].
Absi, Nabil ;
Kedad-Sidhoum, Safia ;
Dauzere-Peres, Stephane .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (09) :2551-2566
[3]   The single-item lot-sizing problem with immediate lost sales [J].
Aksen, D ;
Altinkemer, K ;
Chand, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 147 (03) :558-566
[4]   DETERMINISTIC PRODUCTION PLANNING - ALGORITHMS AND COMPLEXITY [J].
FLORIAN, M ;
LENSTRA, JK ;
RINNOOYKAN, AHG .
MANAGEMENT SCIENCE, 1980, 26 (07) :669-679
[5]  
Godichaud M, 2015, 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), P1329, DOI 10.1109/IESM.2015.7380324
[6]   SCHEDULING DISASSEMBLY [J].
GUPTA, SM ;
TALEB, KN .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (08) :1857-1866
[7]  
Hrouga Mustapha, 2020, International Journal of Operational Research, V38, P449
[8]  
Hrouga M, 2016, 2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), P740, DOI 10.1109/IEEM.2016.7797974
[9]   Heuristics for multi-product capacitated disassembly lot sizing with lost sales [J].
Hrouga, M. ;
Godichaud, M. ;
Amodeo, L. .
IFAC PAPERSONLINE, 2016, 49 (12) :628-633
[10]   Capacitated disassembly scheduling with parts commonality and start-up cost and its industrial application [J].
Ji, Xiaocong ;
Zhang, Zhihai ;
Huang, Simin ;
Li, Lefei .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (04) :1225-1243