Study on Mine Pressure Behavior Law of Mining Roadway Passing Concentrated Coal Pillar and Goaf

被引:2
|
作者
Li, Xiaolong [1 ]
Wei, Shengjie [1 ]
Wang, Jun [1 ]
机构
[1] China Univ Min & Technol Beijing, Sch Energy & Min Engn, Beijing 100083, Peoples R China
关键词
centralized coal pillar; stress distribution; numerical simulation; roadway support;
D O I
10.3390/su142013175
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Based on the special spatial position of 1-2 coal and 2-2 coal, this paper adopts a new way of modeling by fish and overcomes the difficulty of modeling, simulates the influence of the coal pillar on the 22,206 return airway after mining 1-2 coal seam by Flac3D, studies the 22,206 return airway under the influence of primary and secondary mining, and puts forward the support scheme of the 22,206 return airway. The following conclusions are obtained: (1) After mining 1-2 coal, the stress of the 22,206-return airway under the residual coal pillar of 1-2 coal increased. The maximum stress position is below the middle coal pillar of 1-2 coal, and its maximum vertical stress (sigma v(max)) and maximum horizontal stress (sigma h(max)) are 6.24 MPa and 4.09 MPa, respectively. (2) The rule of 22,206 return airway's pressure appearance is that the stress and plastic zone becomes larger when near the coal pillar, becomes smaller when far from the coal pillar, the maximum failure radius of roof and floor is only 1.3 m, and 0.6 m, the maximum failure radius of roadway side is 0.6 m and 1.5 m after the second mining. (3) According to the proposed support scheme, field experiments found that the maximum displacement is less than 120 mm, which can effectively guarantee the stability of the roadway.
引用
收藏
页数:12
相关论文
共 50 条
  • [41] Stability of Coal Pillar and Roof Movement Characteristics in Roadway Backfill Mining
    Lin, Hai
    Yang, Renshu
    Li, Yongliang
    Fang, Shizheng
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [42] An Experimental Study of Industrial Site and Shaft Pillar Mining at Jinggezhuang Coal Mine
    Li, Peixian
    Zhu, Xiaoya
    Ding, Xingcheng
    Zhang, Tao
    APPLIED SCIENCES-BASEL, 2023, 13 (04):
  • [43] A study of surface subsidence and coal pillar safety for strip mining in a deep mine
    Sun, Wei
    Zhang, Qi
    Luan, Yuanzhong
    Zhang, Xiao-Ping
    ENVIRONMENTAL EARTH SCIENCES, 2018, 77 (17)
  • [44] Study on Arranging Mining Roadway under Inclined Seam Goaf
    Xiao, Fukun
    Lu, Gaoming
    Fan, Huiqiang
    Zhang, Chunjie
    Liu, Gang
    ENVIRONMENTAL PROTECTION AND RESOURCES EXPLOITATION, PTS 1-3, 2013, 807-809 : 2404 - +
  • [45] Study on the propagation law of gas explosion in the space based on the goaf characteristic of coal mine
    Ke Gao
    Li Sheng-nan
    Han Rong
    Li Run-zhi
    Liu Zi-meng
    Qi Zhi-peng
    Liu Ze-Yi
    SAFETY SCIENCE, 2020, 127
  • [46] Study on the Diffusion Law of Fluidized Filling Gangue Slurry in Goaf of Coal Mine Underground
    Wei, Baoning
    Huang, Qingxiang
    Zhuang, Dengdeng
    Cao, Xin
    Hui, Bo
    Zuo, Xiao
    Zhu, Mengbo
    GEOFLUIDS, 2024, 2024
  • [47] Study on Hydraulic Connection and Seepage Law of Goaf Groups in Coal Mine Underground Reservoir
    Qin, Wei
    GEOFLUIDS, 2022, 2022
  • [48] Control Technology of Soft Rock Floor in Mining Roadway with Coal Pillar Protection: A case study
    Jia, Housheng
    Wang, Luyao
    Fan, Kai
    Peng, Bo
    Pan, Kun
    ENERGIES, 2019, 12 (15)
  • [49] Combined support technology for main roadway passing through goaf: A case study
    Chen, Dongdong
    Zhang, Qing
    Xie, Shengrong
    Jiang, Zaisheng
    Li, Yubo
    Gao, Mingming
    Li, Hui
    Wu, Xiaoyu
    Wang, En
    Shi, Songhao
    Wang, Long
    ENERGY SCIENCE & ENGINEERING, 2020, 8 (11) : 3925 - 3941
  • [50] Width optimization of narrow coal pillar of roadway driving along goaf in fully mechanized top coal caving face
    Qi F.
    Zhou Y.
    Cao Z.
    Zhang Q.
    Li N.
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2016, 33 (03): : 475 - 480