NEW MODEL OF PANNING AND SCHEDULING FOR JOB-SHOP PRODUCTION SYSTEM WITH ENERGY CONSIDERATION

被引:5
|
作者
Hassani, Zineb Ibn Majdoub [1 ]
El Barkany, Abdellah [1 ]
El Abbassi, Ikram [2 ]
Jabri, Abdelouahhab [1 ]
Darcherif, Abdel Moumen [2 ]
机构
[1] Sidi Mohammed Ben Abdellah Univ, Mech Engn Lab, Fac Sci & Tech, BP 2202,Route Imouzzer, Fes, Morocco
[2] ECAM EPMI, Cergy, France
关键词
production; planning; scheduling; MILP; energy; resolution; CPLEX; LOT-SIZING PROBLEM; PEAK-LOAD MANAGEMENT; SUPPLY CHAIN; GENETIC ALGORITHM; INVENTORY; TIME; DESIGN; COST; CONSUMPTION;
D O I
10.24425/mper.2019.128247
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper reports a new multi-item planning and scheduling problem in a job-shop production system with the consideration of energy consumption. A mixed integer linear programming is proposed to integrate planning and scheduling with the consideration of energy aspect. In this study a new operational constraint is considered in the tactical level because of the huge interest given to energy consumption and its strong link existing with production system. To evaluate the performance of this model, computational experiments are presented, and numerical results are given using the software CPLEX and then discussed.
引用
收藏
页码:89 / 97
页数:9
相关论文
共 50 条
  • [41] A new hybrid parallel genetic algorithm for the job-shop scheduling problem
    Spanos, Athanasios C.
    Ponis, Stavros T.
    Tatsiopoulos, Ilias P.
    Christou, Ioannis T.
    Rokou, Elena
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2014, 21 (03) : 479 - 499
  • [42] An evolutionary approach to complex job-shop and flexible manufacturing system scheduling
    Rossi, A
    Dini, G
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2001, 215 (02) : 233 - 245
  • [43] Flexible job-shop scheduling with learning and forgetting effect by Multi-Agent System
    Renna, Paolo
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2019, 10 (04) : 521 - 534
  • [44] Scheduling in flexible job-shop manufacturing system by improved tabu search
    Eshlaghy, Abbas Toloie
    Sheibatolhamdy, Seyed Ahmad
    AFRICAN JOURNAL OF BUSINESS MANAGEMENT, 2011, 5 (12): : 4863 - 4872
  • [45] A GAPN Approach for the Flexible Job-Shop Scheduling Problem with Indirect Energy and Time-of-Use Electricity Pricing
    Guo, Jianhua
    Luo, Qiuyun
    Liang, Peng
    Ouyang, Jia
    PROCESSES, 2022, 10 (05)
  • [46] A Genetics Algorithm for Solving Job-Shop Scheduling Problems in FMS
    Li, Shoutao
    Jiang, Wei
    Tian, Wei
    2015 27TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2015, : 1634 - 1639
  • [47] The generalized energy-aware flexible job shop scheduling model: A constraint programming approach
    Terbrack, Hajo
    Claus, Thorsten
    COMPUTERS & INDUSTRIAL ENGINEERING, 2025, 204
  • [48] FLEXIBLE JOB-SHOP SCHEDULING FOR REDUCED MANUFACTURING CARBON FOOTPRINT
    Liu, Qiong
    Tian, Youquan
    Wang, Chao
    Chekem, Freddy
    Sutherland, John W.
    PROCEEDINGS OF THE ASME 12TH INTERNATIONAL MANUFACTURING SCIENCE AND ENGINEERING CONFERENCE - 2017, VOL 4, 2017,
  • [49] New single machine and job-shop scheduling problems with availability constraints
    Mauguière, P
    Billaut, JC
    Bouquard, JL
    JOURNAL OF SCHEDULING, 2005, 8 (03) : 211 - 231
  • [50] New Single Machine and Job-Shop Scheduling Problems with Availability Constraints
    Ph. Mauguière
    J.-C. Billaut
    J.-L. Bouquard
    Journal of Scheduling, 2005, 8 : 211 - 231