NEW MODEL OF PANNING AND SCHEDULING FOR JOB-SHOP PRODUCTION SYSTEM WITH ENERGY CONSIDERATION

被引:5
|
作者
Hassani, Zineb Ibn Majdoub [1 ]
El Barkany, Abdellah [1 ]
El Abbassi, Ikram [2 ]
Jabri, Abdelouahhab [1 ]
Darcherif, Abdel Moumen [2 ]
机构
[1] Sidi Mohammed Ben Abdellah Univ, Mech Engn Lab, Fac Sci & Tech, BP 2202,Route Imouzzer, Fes, Morocco
[2] ECAM EPMI, Cergy, France
关键词
production; planning; scheduling; MILP; energy; resolution; CPLEX; LOT-SIZING PROBLEM; PEAK-LOAD MANAGEMENT; SUPPLY CHAIN; GENETIC ALGORITHM; INVENTORY; TIME; DESIGN; COST; CONSUMPTION;
D O I
10.24425/mper.2019.128247
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper reports a new multi-item planning and scheduling problem in a job-shop production system with the consideration of energy consumption. A mixed integer linear programming is proposed to integrate planning and scheduling with the consideration of energy aspect. In this study a new operational constraint is considered in the tactical level because of the huge interest given to energy consumption and its strong link existing with production system. To evaluate the performance of this model, computational experiments are presented, and numerical results are given using the software CPLEX and then discussed.
引用
收藏
页码:89 / 97
页数:9
相关论文
共 50 条
  • [21] An Adaptive Annealing Genetic Algorithm for job-shop scheduling
    Liu, Min
    Bai, Li
    ICIEA 2008: 3RD IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS, PROCEEDINGS, VOLS 1-3, 2008, : 18 - +
  • [22] An optimization model for carbon efficiency of a job-shop manufacturing system
    Li, H. C.
    Cao, H. J.
    3RD CIRP GLOBAL WEB CONFERENCE - PRODUCTION ENGINEERING RESEARCH ADVANCEMENT BEYOND STATE OF THE ART (CIRPE2014), 2015, 28 : 113 - 118
  • [23] A general efficient neighborhood structure framework for the job-shop and flexible job-shop scheduling problems
    Tamssaouet, Karim
    Dauzere-Peres, Stephane
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 311 (02) : 455 - 471
  • [24] Non-energy based neural networks for job-shop scheduling
    Jeng, MD
    Chang, CY
    ELECTRONICS LETTERS, 1997, 33 (05) : 399 - 400
  • [25] Minimum-Energy Scheduling of Flexible Job-Shop Through Optimization and Comprehensive Heuristic
    Olanrewaju, Oludolapo Akanni
    Krykhtine, Fabio Luiz Peres
    Mora-Camino, Felix
    ALGORITHMS, 2024, 17 (11)
  • [26] Energy efficiency, robustness, and makespan optimality in job-shop scheduling problems
    Salido, Miguel A.
    Escamilla, Joan
    Barber, Federico
    Giret, Adriana
    Tang, Dunbing
    Dai, Min
    AI EDAM-ARTIFICIAL INTELLIGENCE FOR ENGINEERING DESIGN ANALYSIS AND MANUFACTURING, 2016, 30 (03): : 300 - 312
  • [27] Fuzzy job-shop scheduling problems: A review
    Abdullah, Salwani
    Abdolrazzagh-Nezhad, Majid
    INFORMATION SCIENCES, 2014, 278 : 380 - 407
  • [28] Hybird algorithm for job-shop scheduling problem
    Chen, X
    Kong, QS
    Wu, QD
    PROCEEDINGS OF THE 4TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-4, 2002, : 1739 - 1743
  • [29] Flexible Job-Shop Scheduling with Changeover Priorities
    Milne, Holden
    Adesina, Opeyemi
    Campbell, Russell
    Friesen, Barbara
    Khawaja, Masud
    MACHINE LEARNING, OPTIMIZATION, AND DATA SCIENCE (LOD 2021), PT I, 2022, 13163 : 611 - 625
  • [30] Flexible job-shop scheduling with transportation resources
    Berterottiere, Lucas
    Dauzere-Peres, Stephane
    Yugma, Claude
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 312 (03) : 890 - 909