Seven-dimensional automated construction waste quantification and management framework: Integration with project and site planning

被引:45
作者
Bakchan, Amal [1 ]
Faust, Kasey M. [2 ]
Leite, Fernanda [2 ]
机构
[1] Univ Texas Austin, Dept Civil Architectural & Environm Engn, 301 E Dean Keeton St,C1752, Austin, TX 78712 USA
[2] Univ Texas Austin, Dept Civil Architectural & Environm Engn, Construct Engn & Project Management Program, 301 E Dean Keeton St,C1752, Austin, TX 78712 USA
关键词
Construction waste; Automated quantification; Reuse; Recycling; Disposal planning; DEMOLITION WASTE; ECONOMIC-FEASIBILITY; DEBRIS GENERATION; MODEL; MINIMIZATION; SYSTEM; IMPACT;
D O I
10.1016/j.resconrec.2019.02.020
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The large proportions of waste generated from the construction industry have led to adverse environmental and economic impacts. Consequentially, there is a need for effective construction waste management (CWM) at construction sites. This study seeks to define Building Information Modeling (BIM) dimensions and respective conceptual interactions that shape the integration of CWM with construction management. A multi-dimensional framework is proposed that leverages BIM-based automated construction waste (CW) estimation capabilities to provide guidance on CWM applications, specifically, CW disposal scheduling, disposal cost estimation, onsite reuse, and allocation of waste bins. The framework presents interactions between these CWM applications and construction management fields-scheduling, estimation, sustainability, and site planning-to enable a strategic alignment between conventional project objectives and CWM. To demonstrate the framework, a real-world pilot project is employed for the case of concrete waste. Data used are documented and tracked from the project and interviews. The results reveal a 5.3% difference between estimated and actual concrete waste quantities. Accordingly, the expected dates for scheduling concrete waste pick-up are estimated for proposed integration into the project schedule. The study estimates savings of over $35,000 from reuse and recycling. Construction activities related to a retaining wall-requiring backfill-are identified from the project schedule as opportunities for reuse. Findings reveal that waste bins could be dedicated to waste streams with high generation rates at each construction stage. Findings from this study would serve as a guide for construction practitioners in assessing key benefits of CWM in improving the scheduling, cost, and sustainability performance of construction projects.
引用
收藏
页码:462 / 474
页数:13
相关论文
共 57 条
  • [21] EPA, 1998, EPA530R98010
  • [22] Strategies for minimizing construction and demolition wastes in Malaysia
    Esa, Mohd Reza
    Halog, Anthony
    Rigamonti, Lucia
    [J]. RESOURCES CONSERVATION AND RECYCLING, 2017, 120 : 219 - 229
  • [23] A study conducted to reduce construction waste generation in Turkey
    Esin, Tulay
    Cosgun, Nilay
    [J]. BUILDING AND ENVIRONMENT, 2007, 42 (04) : 1667 - 1674
  • [24] Application of nD BIM Integrated Knowledge-based Building Management System (BIM-IKBMS) for inspecting post-construction energy efficiency
    GhaffarianHoseini, Ali
    Zhang, Tongrui
    Nwadigo, Okechukwu
    GhaffarianHoseini, Amirhosein
    Naismith, Nicola
    Tookey, John
    Raahemifar, Kaamran
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2017, 72 : 935 - 949
  • [25] Comparative environmental evaluation of construction waste management through different waste sorting systems in Hong Kong
    Hossain, Md. Uzzal
    Wu, Zezhou
    Poon, Chi Sun
    [J]. WASTE MANAGEMENT, 2017, 69 : 325 - 335
  • [26] Jain M., 2012, INT J SCI RES PUBL, V2, P2250
  • [27] An empirical study of perceptions towards construction and demolition waste recycling and reuse in China
    Jin, Ruoyu
    Li, Bo
    Zhou, Tongyu
    Wanatowski, Dariusz
    Piroozfar, Poorang
    [J]. RESOURCES CONSERVATION AND RECYCLING, 2017, 126 : 86 - 98
  • [28] Waste generated in high-rise buildings construction: A quantification model based on statistical multiple regression
    Kern, Andrea Parisi
    Dias, Michele Ferreira
    Kulakowski, Marlova Piva
    Gomes, Luciana Paulo
    [J]. WASTE MANAGEMENT, 2015, 39 : 35 - 44
  • [29] Estimation of construction waste generation and management in Thailand
    Kofoworola, Oyeshola Femi
    Gheewala, Shabbir H.
    [J]. WASTE MANAGEMENT, 2009, 29 (02) : 731 - 738
  • [30] Lau HH, 2008, INT J ENVIRON RES, V2, P261