Seven-dimensional automated construction waste quantification and management framework: Integration with project and site planning

被引:45
作者
Bakchan, Amal [1 ]
Faust, Kasey M. [2 ]
Leite, Fernanda [2 ]
机构
[1] Univ Texas Austin, Dept Civil Architectural & Environm Engn, 301 E Dean Keeton St,C1752, Austin, TX 78712 USA
[2] Univ Texas Austin, Dept Civil Architectural & Environm Engn, Construct Engn & Project Management Program, 301 E Dean Keeton St,C1752, Austin, TX 78712 USA
关键词
Construction waste; Automated quantification; Reuse; Recycling; Disposal planning; DEMOLITION WASTE; ECONOMIC-FEASIBILITY; DEBRIS GENERATION; MODEL; MINIMIZATION; SYSTEM; IMPACT;
D O I
10.1016/j.resconrec.2019.02.020
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The large proportions of waste generated from the construction industry have led to adverse environmental and economic impacts. Consequentially, there is a need for effective construction waste management (CWM) at construction sites. This study seeks to define Building Information Modeling (BIM) dimensions and respective conceptual interactions that shape the integration of CWM with construction management. A multi-dimensional framework is proposed that leverages BIM-based automated construction waste (CW) estimation capabilities to provide guidance on CWM applications, specifically, CW disposal scheduling, disposal cost estimation, onsite reuse, and allocation of waste bins. The framework presents interactions between these CWM applications and construction management fields-scheduling, estimation, sustainability, and site planning-to enable a strategic alignment between conventional project objectives and CWM. To demonstrate the framework, a real-world pilot project is employed for the case of concrete waste. Data used are documented and tracked from the project and interviews. The results reveal a 5.3% difference between estimated and actual concrete waste quantities. Accordingly, the expected dates for scheduling concrete waste pick-up are estimated for proposed integration into the project schedule. The study estimates savings of over $35,000 from reuse and recycling. Construction activities related to a retaining wall-requiring backfill-are identified from the project schedule as opportunities for reuse. Findings reveal that waste bins could be dedicated to waste streams with high generation rates at each construction stage. Findings from this study would serve as a guide for construction practitioners in assessing key benefits of CWM in improving the scheduling, cost, and sustainability performance of construction projects.
引用
收藏
页码:462 / 474
页数:13
相关论文
共 57 条
  • [1] Critical management practices influencing on-site waste minimization in construction projects
    Ajayi, Saheed O.
    Oyedele, Lukumon O.
    Bilal, Muhammad
    Akinade, Olugbenga O.
    Alaka, Hafiz A.
    Owolabi, Hakeem A.
    [J]. WASTE MANAGEMENT, 2017, 59 : 330 - 339
  • [2] A structural equation model for enhancing effectiveness of engineering, procurement and construction (EPC) major projects: End-user's perspective
    Aldhaheri, Mohamed
    Bakchan, Amal
    Sandhu, Maqsood Ahmad
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (09) : 1226 - 1252
  • [3] [Anonymous], 2014, Building Code Requirements for Structural Concrete (ACI 318-14) and Commentary (ACI 318R-14). ACI 318-14
  • [4] [Anonymous], [No title captured]
  • [5] [Anonymous], 2017, BIM-based software for construction waste analytics using artificial intelligence hybrid models
  • [6] Construction waste generation estimates of institutional building projects: Leveraging waste hauling tickets
    Bakchan, Amal
    Faust, Kasey M.
    [J]. WASTE MANAGEMENT, 2019, 87 : 301 - 312
  • [7] Behavioral determinants towards enhancing construction waste management: A Bayesian Network analysis
    Bakshan, Amal
    Srour, Issam
    Chehab, Ghassan
    El-Fadel, Mutasem
    Karaziwan, Jalal
    [J]. RESOURCES CONSERVATION AND RECYCLING, 2017, 117 : 274 - 284
  • [8] A field based methodology for estimating waste generation rates at various stages of construction projects
    Bakshan, Amal
    Srour, Issam
    Chehab, Ghassan
    El-Fadel, Mutasem
    [J]. RESOURCES CONSERVATION AND RECYCLING, 2015, 100 : 70 - 80
  • [9] A benefit-cost analysis on the economic feasibility of construction waste minimisation: The case of Malaysia
    Begum, Rawshan Ara
    Siwar, Chamhuri
    Pereira, Joy Jacqueline
    Jaafar, Abdul Hamid
    [J]. RESOURCES CONSERVATION AND RECYCLING, 2006, 48 (01) : 86 - 98
  • [10] Attitude and behavioral factors in waste management in the construction industry of Malaysia
    Begum, Rawshan Ara
    Siwar, Chamhuri
    Pereira, Joy Jacqueline
    Jaafar, Abdul Hamid
    [J]. RESOURCES CONSERVATION AND RECYCLING, 2009, 53 (06) : 321 - 328