Minimizing makespan subject to minimum total absolute deviation of completion time on identical parallel machines

被引:2
作者
Su, Ling-Huey [1 ]
Chou, Fuh-Der [2 ]
Chen, James C. [3 ]
机构
[1] Chung Yuan Christian Univ, Dept Ind & Syst Engn, Chungli, Taiwan
[2] Ching Yun Univ, Dept Ind Engn & Management, Chungli, Taiwan
[3] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei, Taiwan
关键词
parallel-machine scheduling; hierarchical criteria; total absolute deviation of job completion time; makespan; DETERIORATING JOBS; VARIANCE; MINIMIZATION; OPTIMIZATION; ALGORITHM;
D O I
10.1080/0305215X.2011.644544
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study addresses the identical parallel machine scheduling problem with the objective of minimizing makespan subject to minimum total absolute deviation of job completion time (TADC). An optimization algorithm is first proposed to solve TADC on an identical parallel machine and an iterative procedure based on a polynomial binary integer programming model is then proposed to minimize makespan. Computational experiments show that the proposed algorithm is efficient. The worst case performance, which refers to the largest average execution for each scenario of the experiments, is 229.10 seconds for the problem with n = 200, m = 30 and p(j) from a uniform [1,100].
引用
收藏
页码:1187 / 1195
页数:9
相关论文
共 50 条
[31]   Total absolute deviation of job completion times on uniform and unrelated machines [J].
Mor, Baruch ;
Mosheiov, Gur .
COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (03) :660-665
[32]   Minimizing makespan on parallel machines with batch arrivals [J].
Chung, Tsui-Ping ;
Liao, Ching-Jong ;
Lin, Chien-Hung .
ENGINEERING OPTIMIZATION, 2012, 44 (04) :467-476
[33]   Minimizing resource consumption on uniform parallel machines with a bound on makespan [J].
Ji, Min ;
Wang, Jen-Ya ;
Lee, Wen-Chiung .
COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (12) :2970-2974
[34]   An effective approach for total completion time minimization subject to makespan constraint in permutation flowshops [J].
Pastore, E. ;
Alfieri, A. .
ENGINEERING OPTIMIZATION, 2024, 56 (12) :2148-2163
[35]   Minimizing the Number of Tardy Jobs on Identical Parallel Machines Subject to Periodic Maintenance [J].
Najat, Almasarwah ;
Yuan, Chen ;
Gursel, Suer ;
Tao, Yuan .
29TH INTERNATIONAL CONFERENCE ON FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING (FAIM 2019): BEYOND INDUSTRY 4.0: INDUSTRIAL ADVANCES, ENGINEERING EDUCATION AND INTELLIGENT MANUFACTURING, 2019, 38 :1409-1416
[36]   Minimizing the total completion time on a parallel machine system with tool changes [J].
Costa, A. ;
Cappadonna, F. A. ;
Fichera, S. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 91 :290-301
[37]   A multi-agent scheduling problem for two identical parallel machines to minimize total tardiness time and makespan [J].
Yu, Fei ;
Wen, Peihan ;
Yi, Shuping .
ADVANCES IN MECHANICAL ENGINEERING, 2018, 10 (02)
[38]   A note on minimizing the sum of squares of machine completion times on two identical parallel machines [J].
Rico Walter .
Central European Journal of Operations Research, 2017, 25 :139-144
[39]   A note on minimizing the sum of squares of machine completion times on two identical parallel machines [J].
Walter, Rico .
CENTRAL EUROPEAN JOURNAL OF OPERATIONS RESEARCH, 2017, 25 (01) :139-144
[40]   Parallel machine scheduling with a total energy consumption limitation for minimizing total completion time [J].
Li, Kai ;
Xie, Fulong ;
Zhao, Xin ;
Chen, Jianfu ;
Zhou, Tao .
ENGINEERING OPTIMIZATION, 2025, 57 (07) :1800-1827