Minimizing makespan subject to minimum total absolute deviation of completion time on identical parallel machines

被引:2
|
作者
Su, Ling-Huey [1 ]
Chou, Fuh-Der [2 ]
Chen, James C. [3 ]
机构
[1] Chung Yuan Christian Univ, Dept Ind & Syst Engn, Chungli, Taiwan
[2] Ching Yun Univ, Dept Ind Engn & Management, Chungli, Taiwan
[3] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei, Taiwan
关键词
parallel-machine scheduling; hierarchical criteria; total absolute deviation of job completion time; makespan; DETERIORATING JOBS; VARIANCE; MINIMIZATION; OPTIMIZATION; ALGORITHM;
D O I
10.1080/0305215X.2011.644544
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study addresses the identical parallel machine scheduling problem with the objective of minimizing makespan subject to minimum total absolute deviation of job completion time (TADC). An optimization algorithm is first proposed to solve TADC on an identical parallel machine and an iterative procedure based on a polynomial binary integer programming model is then proposed to minimize makespan. Computational experiments show that the proposed algorithm is efficient. The worst case performance, which refers to the largest average execution for each scenario of the experiments, is 229.10 seconds for the problem with n = 200, m = 30 and p(j) from a uniform [1,100].
引用
收藏
页码:1187 / 1195
页数:9
相关论文
共 50 条
  • [1] Minimizing makespan subject to minimum total flow-time on identical parallel machines
    Gupta, JND
    Ruiz-Torres, AJ
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 125 (02) : 370 - 380
  • [2] Minimizing total weighted flowtime subject to minimum makespan on two identical parallel machines
    Ho, Johnny C.
    Lopez, Francisco J.
    Ruiz-Torres, Alex J.
    Tseng, Tzu-Liang
    JOURNAL OF INTELLIGENT MANUFACTURING, 2011, 22 (02) : 179 - 190
  • [3] Minimizing total weighted flowtime subject to minimum makespan on two identical parallel machines
    Johnny C. Ho
    Francisco J. López
    Alex J. Ruiz-Torres
    Tzu-Liang (Bill) Tseng
    Journal of Intelligent Manufacturing, 2011, 22 : 179 - 190
  • [4] Minimizing makespan subject to minimum flowtime on two identical parallel machines
    Gupta, JND
    Ho, JC
    COMPUTERS & OPERATIONS RESEARCH, 2001, 28 (07) : 705 - 717
  • [5] Minimizing Makespan on Identical Parallel Machines
    Habiba, Houari
    Hassam, Ahmed
    Sari, Zaki
    Amine, Cherier Mohamed
    Souad, Tahraoui
    2019 3RD INTERNATIONAL CONFERENCE ON APPLIED AUTOMATION AND INDUSTRIAL DIAGNOSTICS (ICAAID 2019), 2019,
  • [6] Approximation algorithms for bicriteria scheduling problems on identical parallel machines for makespan and total completion time
    Jiang, Xiaojuan
    Lee, Kangbok
    Pinedo, Michael L.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 305 (02) : 594 - 607
  • [7] Minimizing earliness and tardiness subject to total completion time in an identical parallel machine system
    Su, Ling-Huey
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (02) : 461 - 471
  • [8] A LISTFIT heuristic for minimizing makespan on identical parallel machines
    Gupta, JND
    Ruiz-Torres, J
    PRODUCTION PLANNING & CONTROL, 2001, 12 (01) : 28 - 36
  • [9] Algorithms for no-wait flowshops with total completion time subject to makespan
    Allahverdi, Ali
    Aydilek, Harun
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 68 (9-12): : 2237 - 2251
  • [10] Scheduling two interfering job sets on identical parallel machines with makespan and total completion time minimization
    Rault, Tifenn
    Sadi, Faiza
    Billaut, Jean-Charles
    Soukhal, Ameur
    JOURNAL OF SCHEDULING, 2024, 27 (05) : 485 - 505