Seismic evaluation of two-elevation ceiling system by shake table tests

被引:27
作者
Qi, Liangjie [1 ,2 ]
Kurata, Masahiro [1 ]
Ikeda, Yoshiki [1 ]
Kunitomo, Keiichiro [3 ]
Takaoka, Masashi [4 ]
机构
[1] Kyoto Univ, Disaster Prevent Res Inst, Kyoto, Kyoto, Japan
[2] Xian Univ Architecture & Technol, Sch Civil Engn, Xian, Shaanxi, Peoples R China
[3] Kyoto Univ, Dept Architecture & Architectural Engn, Kyoto, Kyoto, Japan
[4] OKUJU Corp, Dev Dept, Osaka, Japan
基金
日本学术振兴会;
关键词
interaction; nonstructural equipment; shake table test; temporary‐ positioning‐ bracing bar; two‐ elevation ceiling system; PERFORMANCE; EARTHQUAKE;
D O I
10.1002/eqe.3390
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Past earthquakes highlighted the vulnerability of the suspended ceiling, especially in earthquake-prone countries like Japan; the post-earthquake reconnaissance showed that damage to ceiling systems led to immeasurable economic loss and disturbance of the timely rescue of casualty. The existing studies have mostly focused on the seismic performance of regular square and leveled ceilings, whereas the inevitable requirements to accommodate air ducts, nonstructural piping, and electrical equipment resulted in a two-elevation ceiling system. This paper reports a series of full-scale shake table tests on a typical two-elevation ceiling system, which includes electrical equipment, piping system, and commonly used suspended ceiling structure. Experimental observations showed that the two-elevation ceiling system performed well under earthquake excitation. No fallen panels or overall system collapse occurred during shaking. This paper discusses the effects of a temporary-positioning-bracing bar (TPBB) between two ceiling elevations and peripheral constraints by surrounding wall on the acceleration and displacement response and torsional behavior in the ceiling system. Then, a simplified analytical model was established and verified with the experimental response of different ceiling configurations. The test results indicated that a sufficiently strong TPBB is essential to reduce the relative displacement between two ceiling elevations, and it ensures the integrity of two ceiling elevations in the ceiling system. In conclusion, the TPBB shall remain in the ceiling system after the construction stage.
引用
收藏
页码:1147 / 1166
页数:20
相关论文
共 37 条
[31]  
Sasaki T., 2017, 16 WORLD C EARTHQ EN
[32]  
Sato Y, 2011, 9 PAC C EARTHQ ENG A
[33]   Fragility Analysis of Suspended Ceiling Systems in a Full-Scale Experiment [J].
Soroushian, Siavash ;
Rahmanishamsi, Esmaeel ;
Jenkins, Craig ;
Maragakis, E. Manos .
JOURNAL OF STRUCTURAL ENGINEERING, 2019, 145 (04)
[34]   Experimental Fragility Analysis of Suspension Ceiling Systems [J].
Soroushian, Siavash ;
Rahmanishamsi, Esmaeel ;
Ryu, Ki P. ;
Maragakis, Manos ;
Reinhorn, Andrei M. .
EARTHQUAKE SPECTRA, 2016, 32 (02) :881-908
[35]   Seismic Simulation of an Integrated Ceiling-Partition Wall-Piping System at E-Defense. II: Evaluation of Nonstructural Damage and Fragilities [J].
Soroushian, Siavash ;
Maragakis, E. Manos ;
Ryan, Keri L. ;
Sato, Eiji ;
Sasaki, Tomohiro ;
Okazaki, Taichiro ;
Mosqueda, Gilberto .
JOURNAL OF STRUCTURAL ENGINEERING, 2016, 142 (02)
[36]   Shake table tests of suspended ceilings to simulate the observed damage in the M s7.0 Lushan earthquake, China [J].
Wang Duozhi ;
Dai Junwu ;
Qu Zhe ;
Ning Xiaoqing .
EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION, 2016, 15 (02) :239-249
[37]   Shaking table tests on seismic response of backdrop metal ceilings [J].
Zhou, Tie G. ;
Wei, Shuai S. ;
Zhao, Xiang ;
Ma, Le W. ;
Yuan, Yi M. ;
Luo, Zheng .
STEEL AND COMPOSITE STRUCTURES, 2019, 32 (06) :807-819