A copula-based fuzzy chance-constrained programming model and its application to electric power generation systems planning

被引:47
作者
Chen, F. [1 ]
Huang, G. H. [2 ,3 ]
Fan, Y. R. [1 ]
Chen, J. P. [1 ]
机构
[1] Univ Regina, Fac Engn, Regina, SK S4S 0A2, Canada
[2] Univ Regina, UR NCEPU, Inst Energy Environm & Sustainabil Res, Regina, SK S4S 0A2, Canada
[3] North China Elect Power Univ, Inst Energy Environm & Sustainabil Res, UR NCEPU, Beijing 102206, Peoples R China
关键词
Copula; Joint-probabilistic constrained; programming; Generalized fuzzy linear programming; Multiple uncertainties; Electric power generation systems planning; DYNAMIC OPTIMIZATION APPROACH; SOLID-WASTE MANAGEMENT; FREQUENCY-ANALYSIS; ENERGY; ASSOCIATION; UNCERTAINTY; PARAMETER; FEASIBILITY;
D O I
10.1016/j.apenergy.2016.11.065
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This study developed a copula-based fuzzy chance-constrained programming (CFCCP) model and applied it to electric power generation systems planning under multiple uncertainties. The CFCCP model was formulated by incorporating existing joint-probabilistic constrained programming and generalized fuzzy linear programming techniques within a general mixed-integer linear programming framework. The CFCCP model can not only effectively reflect uncertain interactions among random variables even when the random variables follow different probability distributions and have previously unknown correlations, but can also provide information about the membership grades for the decision variables and objective-function values. Thus, it would have a wider application scope than existing optimization models for power generation systems planking. Its applicability has been demonstrated through a case study of electric power generation planning within a region of North China. As a result, fuzzy interval solutions related to power generation and capacity expansion patterns of electricity-generation facilities, and primary energy supply structures were generated within six scenarios of constraint-violation levels under different a-cut levels. The results are helpful to investigate dynamic features of the regional power generation system, identify desired decision alternatives, and analyze the influences of interactions among multiple uncertainties on system outputs. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:291 / 309
页数:19
相关论文
共 51 条
[1]   On solutions of fuzzy random multiobjective quadratic programming with applications in portfolio problem [J].
Ammar, E. E. .
INFORMATION SCIENCES, 2008, 178 (02) :468-484
[2]  
[Anonymous], 1988, Fuzzy MAthematical Models in Engineering and Management Science
[3]  
[Anonymous], 2003, Econometrics Journal, DOI [DOI 10.1111/1368-423X.00101, 10.1111/1368-423X.00101]
[4]   Identification of optimal strategies for energy management systems planning under multiple uncertainties [J].
Cai, Y. P. ;
Huang, G. H. ;
Yang, Z. F. ;
Tan, Q. .
APPLIED ENERGY, 2009, 86 (04) :480-495
[5]   Community-scale renewable energy systems planning under uncertainty-An interval chance-constrained programming approach [J].
Cai, Y. P. ;
Huang, G. H. ;
Yang, Z. F. ;
Lin, Q. G. ;
Tan, Q. .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2009, 13 (04) :721-735
[6]  
Charnes A., 1972, Optimizing Methods in Statistics
[7]  
Chen F, 2015, J AIR WASTE MANAGE A
[8]   Inexact Multistage Fuzzy-Stochastic Programming Model for Water Resources Management [J].
Chen, Fang ;
Huang, G. H. ;
Fan, Y. R. .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2015, 141 (11)
[9]   A linearization and parameterization approach to tri-objective linear programming problems for power generation expansion planning [J].
Chen, Fang ;
Huang, Guohe ;
Fan, Yurui .
ENERGY, 2015, 87 :240-250
[10]   An inexact bi-level simulation-optimization model for conjunctive regional renewable energy planning and air pollution control for electric power generation systems [J].
Chen, Yizhong ;
He, Li ;
Li, Jing ;
Cheng, Xi ;
Lu, Hongwei .
APPLIED ENERGY, 2016, 183 :969-983